Fuzzy-Petri-net-based disassembly planning considering human factors
暂无分享,去创建一个
[1] Jin-Fu Chang,et al. Knowledge Representation Using Fuzzy Petri Nets , 1990, IEEE Trans. Knowl. Data Eng..
[2] H. Jahan-Shahi,et al. Multivalued Fuzzy Sets in Cost/Time Estimation of Flat Plate Processing , 2001 .
[3] Reha Uzsoy,et al. Optimal disassembly configurations for single and multiple products , 1999 .
[4] Jong-Oh Park,et al. Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects , 2001 .
[5] MengChu Zhou,et al. Fuzzy reasoning Petri nets , 2003, IEEE Trans. Syst. Man Cybern. Part A.
[6] Gunnar Sohlenius,et al. Towards Profitable Persistent Manufacturing. Human Factors in Overcoming Disturbances in Production Systems , 1999 .
[7] MengChu Zhou,et al. Design and implementation of an adaptive process planner for disassembly processes , 2000, IEEE Trans. Robotics Autom..
[8] Steven J Skerlos,et al. Multi-criteria decision-making for optimization of product disassembly under multiple situations. , 2003, Environmental science & technology.
[9] A. Lambert. Determining optimum disassembly sequences in electronic equipment , 2002 .
[10] MengChu Zhou,et al. An integrated approach to disassembly planning and demanufacturing operation , 2001, IEEE Trans. Robotics Autom..
[11] Arthur C. Sanderson,et al. Task sequence planning using fuzzy Petri nets , 1995, IEEE Trans. Syst. Man Cybern..
[12] Lin,et al. Optimal operation planning using fuzzy Petri nets with resource constraints , 2002, Int. J. Comput. Integr. Manuf..
[13] MengChu Zhou,et al. Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets , 2004, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[14] Jian-Xin Xu. Fuzzy Petri net-based optimum scheduling of FMS with human factors , 1996, Proceedings of 35th IEEE Conference on Decision and Control.
[15] Mansour Rahimi,et al. On Managing the Human Factors Engineering of Hybrid Production Systems , 1988 .
[16] Spyros Reveliotis,et al. Uncertainty management in optimal disassembly planning through learning-based strategies , 2007 .
[17] Surendra M. Gupta,et al. Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..
[18] Michael A. Goodrich,et al. Model-based human-centered task automation: a case study in ACC system design , 2003, IEEE Trans. Syst. Man Cybern. Part A.
[19] MengChu Zhou,et al. Disassembly modeling, planning, and application , 2002 .
[20] Ajd Fred Lambert,et al. Disassembly sequencing: A survey , 2003 .
[21] Rahul Rai,et al. A Petri Net based approach to determine the disassembly strategy of a product , 2002 .
[22] Lev V. Utkin,et al. Analysis of computer integrated manufacturing systems by fuzzy human operator behaviour , 1997 .
[23] Xiaoou Li,et al. Dynamic knowledge inference and learning under adaptive fuzzy Petri net framework , 2000, IEEE Trans. Syst. Man Cybern. Part C.