Informativeness, Incentive Compensation, and the Choice of Inventory Buffer

ABSTRACT: Previous research in management accounting and economics has noted the potential for complementarities between the firm’s performance measurement system and its other organizational design choices. We add to this literature by studying how the informativeness and incentive properties of a performance metric can be influenced by one particular organizational design choice—the size of the firm’s inventory buffers. We model a manufacturing setting in which an agent manages a workstation that processes intermediate units. As intermediate units arrive, they are stored in an inventory buffer until the agent can process them. The buffer can hold a maximum number of intermediate units—its buffer size. The agent is compensated on the basis of his workstation’s throughput. We characterize the conditions under which reducing the inventory buffer enhances/degrades the informativeness of the performance metric and, hence, mitigates/exacerbates the agent’s incentive problem.

[1]  Srikant M. Datar,et al.  Optimal Incentive Schemes in Bottleneck Constrained Production Environments , 1995 .

[2]  Richard Schonberger,et al.  World class manufacturing : the lessons of simplicity applied , 1986 .

[3]  John W. Boudreau,et al.  The Effects of Low Inventory on the Development of Productivity Norms , 1999 .

[4]  Suresh Radhakrishnan,et al.  Delay Cost and Incentive Schemes for Multiple Users , 1995 .

[5]  Erica L. Plambeck,et al.  Incentive Efficient Control of a Make-to-Stock Production System , 2003, Oper. Res..

[6]  Kashi R. Balachandran,et al.  Service capacity decision and incentive compatible cost allocation for reporting usage forecasts , 2004, Eur. J. Oper. Res..

[7]  Nandu J. Nagarajan,et al.  The Effect of Property Rights and Audit Information Quality on Team Incentives for Inventory Reduction , 1998 .

[8]  Thomas Hemmer,et al.  Performance measurement systems, incentives, and the optimal allocation of responsibilities , 1998 .

[9]  Aleda V. Roth,et al.  Incentives That Induce Task-Related Effort, Helping, and Knowledge Sharing in Workgroups , 2007, Manag. Sci..

[10]  David E. M. Sappington,et al.  Information, Incentives, and Organizational Mode , 1987 .

[11]  Dilip Mookherjee,et al.  Hierarchical decentralization of incentive contracts , 1995 .

[12]  Hideshi Itoh Incentives to Help in Multi-agent Situations , 1991 .

[13]  Bengt Holmstrom The Firm as a Subeconomy , 1999 .

[14]  Lauren Xiaoyuan Lu,et al.  Incentives for Quality through Endogenous Routing , 2009, Manuf. Serv. Oper. Manag..

[15]  D. Demougin,et al.  Contractual Design with Correlated Information under Limited Liability , 1991 .

[16]  Towards an economic theory of incentives in just-in-time manufacturing , 1995 .

[17]  B. J. Berkley,et al.  A REVIEW OF THE KANBAN PRODUCTION CONTROL RESEARCH LITERATURE , 2009 .

[18]  Harry Groenevelt,et al.  Chapter 12 The just-in-time system , 1993, Logistics of Production and Inventory.

[19]  T. D. Klastorin,et al.  Impact of material flow policies and goals on job outcomes , 1996 .

[20]  Suresh Radhakrishnan,et al.  Cost of congestion, operational efficiency and management accounting , 1996 .

[21]  Y. Spiegel,et al.  A Double Moral Hazard Model of Organization Design , 2007 .

[22]  Madhav V. Rajan,et al.  Optimal Information Asymmetry , 2005 .

[23]  Hau L. Lee,et al.  Unlocking the Value of RFID , 2007 .

[24]  Madhav V. Rajan,et al.  The Incentive Value of Inventory and Cross-Training in Modern Manufacturing , 2009 .

[25]  Ė. B. Vinberg,et al.  A course in algebra , 2003 .

[26]  M. Gietzmann,et al.  On the Relation between Optimal Incentive Structures and the Cost and Benefits of Bottlenecks , 2002, Journal of Labor Economics.

[27]  Christian Laux,et al.  Limited Liability and Incentive Contracting with Multiple Projects , 2001 .

[28]  Bengt Holmstrom,et al.  Moral Hazard and Observability , 1979 .

[29]  Srikant M. Datar,et al.  Moral hazard and management control in just-in-time settings , 1995 .

[30]  J. Laffont,et al.  The Theory of Incentives: The Principal-Agent Model , 2001 .

[31]  Madhav V. Rajan,et al.  Cost Accounting: A Managerial Emphasis , 1972 .

[32]  Rajiv D. Banker,et al.  Sensitivity, Precision, and Linear Aggregation of Signals for Performance Evaluation , 1989 .

[33]  Paul Milgrom,et al.  Complementarities and fit strategy, structure, and organizational change in manufacturing , 1995 .

[34]  Kenneth L. Schultz,et al.  Modeling and worker motivation in JIT production systems , 1998 .

[35]  Sanford J. Grossman,et al.  AN ANALYSIS OF THE PRINCIPAL-AGENT PROBLEM , 1983 .

[36]  Paul R. Milgrom,et al.  Multitask Principal–Agent Analyses: Incentive Contracts, Asset Ownership, and Job Design , 1991 .

[37]  Paul R. Milgrom,et al.  The Economics of Modern Manufacturing: Technology, Strategy, and Organization , 1990 .

[38]  Gerald A. Feltham,et al.  Performance Measure Congruity and Diversity in Multi-Task Principal/Agent Relations , 2007 .

[39]  Thomas Hemmer,et al.  On the interrelation between production technology, job design, and incentives , 1995 .

[40]  K. A. Brown,et al.  Impact of material flow policies and goals on job outcomes , 1996 .