Considering start-ups and shutdowns using an optimisation tool – Including a dairy production planning case study
暂无分享,去创建一个
[1] Rüdiger Franke,et al. Optimization of boiler start-up using a nonlinear boiler model and hard constraints , 2004 .
[2] Sajad Jafari,et al. Pumped-storage unit commitment with considerations for energy demand, economics, and environmental constraints , 2010 .
[3] Magnus Karlsson,et al. Industrial decision making for energy efficiency : combining optimisation and simulation , 2011 .
[4] Nawzad Mardan,et al. Combining optimisation and simulation in an energy systems analysis of a Swedish iron foundry , 2012 .
[5] Magnus Karlsson,et al. The MIND method: A decision support for optimization of industrial energy systems - Principles and case studies , 2011 .
[6] Ignacio E. Grossmann,et al. A deterministic optimization approach for the unit commitment problem , 2011 .
[7] Gang Li,et al. An MILP model for optimization of byproduct gases in the integrated iron and steel plant , 2010 .
[8] In-Beum Lee,et al. A systematic process integration framework for the optimal design and techno-economic performance analysis of energy supply and CO2 mitigation strategies , 2014 .
[9] G. Wozny,et al. Utility systems operation: Optimisation-based decision making , 2011 .
[10] Magnus Karlsson,et al. Timing and sizing of investments in industrial processes– the use of an optimization tool , 2011 .