An inexact optimization approach for river water-quality management.

A previously developed fuzzy waste load allocation model (FWLAM) for a river system is extended to address uncertainty involved in fixing the membership functions for the fuzzy goals of the pollution control agency (PCA) and the dischargers using the concept of grey systems. The model provides flexibility for the PCA and the dischargers to specify their goals independently, as the parameters for membership functions are considered as interval grey numbers instead of deterministic real numbers. An inexact or a grey fuzzy optimization model is developed in a multiobjective framework, to maximize the width of the interval valued fractional removal levels for providing latitude in decision-making and to minimize the width of the goal fulfillment level for reducing the system uncertainty. The concept of an acceptability index for order relation between two partially or fully overlapping intervals is used to get a deterministic equivalent of the grey fuzzy optimization model developed. The improvement of the optimal solutions over a previously developed grey fuzzy waste load allocation model (GFWLAM) is shown through an application to a hypothetical river system. The fuzzy multiobjective optimization and fuzzy goal programming techniques are used to solve the deterministic equivalent of the GFWLAM.

[1]  Masatoshi Sakawa,et al.  Interactive fuzzy decisionmaking for multiobjective nonlinear programming problems , 1984 .

[2]  Robert Ivor John,et al.  Grey systems and interval valued fuzzy sets , 2003, EUSFLAT Conf..

[3]  Shinichiro Ohgaki,et al.  Chance Constrained Model for River Water Quality Management , 1987 .

[4]  P. P. Mujumdar,et al.  Risk Evaluation in Water Quality Management of a River System , 2004 .

[5]  Earle B. Phelps,et al.  A Study of the Pollution and Natural Purification of the Ohio River , 1958 .

[6]  Manfred Grauer,et al.  Interactive Decision Analysis , 1984 .

[7]  Lucien Duckstein,et al.  Regional management of an aquifer for mining under fuzzy environmental objectives , 1983 .

[8]  Ren C. Luo,et al.  Automatic guided intelligent wheelchair system using hierarchical grey-fuzzy motion decision-making algorithms , 1999, Proceedings 1999 IEEE/RSJ International Conference on Intelligent Robots and Systems. Human and Environment Friendly Robots with High Intelligence and Emotional Quotients (Cat. No.99CH36289).

[9]  Masatoshi Sakawa,et al.  Fuzzy nonlinear programming with single or multiple objective functions , 1999 .

[10]  N. Chang,et al.  Water pollution control in river basin by interactive fuzzy interval multiobjective programming , 1997 .

[11]  Slobodan P. Simonovic,et al.  Modeling uncertainty in reservoir loss functions using fuzzy sets , 1999 .

[12]  O. Fujiwara,et al.  River Basin Water Quality Management in Stochastic Environment , 1988 .

[13]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[14]  G. Huang,et al.  Grey integer programming: An application to waste management planning under uncertainty , 1995 .

[15]  R. Hermann Linear systems and the differential field of Heaviside operators , 1981 .

[16]  P. P. Mujumdar,et al.  Fuzzy Waste Load Allocation Model: Simulation-Optimization Approach , 2004 .

[17]  H. Ishibuchi,et al.  Multiobjective programming in optimization of the interval objective function , 1990 .

[18]  Guohe Huang,et al.  Grey fuzzy integer programming: An application to regional waste management planning under uncertainty , 1995 .

[19]  Bijay Baran Pal,et al.  A fuzzy goal programming procedure for solving quadratic bilevel programming problems , 2003, Int. J. Intell. Syst..

[20]  Yi Lin,et al.  An Introduction to Grey Systems: Foundations, Methodology and Applications , 2003 .

[21]  M. Clark,et al.  Dealing with uncertainty: adaptive approaches to sustainable river management , 2002 .

[22]  G. P. Liu,et al.  A nonlinear interval number programming method for uncertain optimization problems , 2008, Eur. J. Oper. Res..

[23]  W. R. Lynn,et al.  Probabilistic models for predicting stream quality , 1966 .

[24]  Guohe Huang,et al.  A GREY LINEAR PROGRAMMING APPROACH FOR MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY , 1992 .

[25]  Masatoshi Sakawa,et al.  An Interactive Fuzzy Satisfying Method for Multiobjective Nonlinear Integer Programming Problems through Genetic Algorithms , 2003, IFSA.

[26]  Debjani Chakraborty,et al.  Interpretation of inequality constraints involving interval coefficients and a solution to interval linear programming , 2001, Fuzzy Sets Syst..

[27]  Janusz Kindler,et al.  Rationalizing Water Requirements with Aid of Fuzzy Allocation Model , 1992 .

[28]  Ni-Bin Chang,et al.  Optimal Expansion of Water Quality Monitoring Network by Fuzzy Optimization Approach , 2004, Environmental monitoring and assessment.

[29]  Timothy K. Gates,et al.  Planning Reservoir Operations with Imprecise Objectives , 1997 .

[30]  P. P. Mujumdar,et al.  A fuzzy risk approach for seasonal water quality management of a river system , 2002 .

[31]  R. Słowiński Fuzzy sets in decision analysis, operations research and statistics , 1999 .

[32]  J. Stedinger,et al.  Water resource systems planning and analysis , 1981 .

[33]  J. Deng,et al.  Introduction to Grey system theory , 1989 .

[34]  Ramon E. Moore Methods and applications of interval analysis , 1979, SIAM studies in applied mathematics.

[35]  Subhankar Karmakar,et al.  A two-phase grey fuzzy optimization approach for water quality management of a river system , 2007 .

[36]  James C. Bezdek,et al.  Analysis of fuzzy information , 1987 .

[37]  Guohe Huang,et al.  AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY , 2000 .

[38]  P. P. Mujumdar,et al.  Uncertainty in Fuzzy Membership Functions for a River Water Quality Management Problem , 2004 .

[39]  Yeou-Koung Tung,et al.  Bi-objective analysis of waste load allocation using fuzzy linear programming , 1989 .

[40]  Vijay K. Minocha,et al.  Fuzzy optimization model for water quality management of a river system - Closure , 1999 .

[41]  Lucien Duckstein,et al.  Fuzzy Rule-Based Modeling of Reservoir Operation , 1996 .

[42]  Deng Ju-Long,et al.  Control problems of grey systems , 1982 .

[43]  K. Sasikumar,et al.  Application of fuzzy probability in water quality management of a river system , 2000, Int. J. Syst. Sci..

[44]  P. P. Mujumdar,et al.  Grey fuzzy optimization model for water quality management of a river system , 2006 .

[45]  Markus Disse,et al.  Fuzzy rule-based models for infiltration , 1993 .

[46]  Yeou-Koung Tung,et al.  Multiple-objective waste load allocation , 1989 .