Twinning Motivation, Productivity and Management Strategy in Construction Projects

Abstract: This article presents the findings of a questionnaire survey conducted on the motivational factors affecting worker's productivity in Australian construction industries. A framework has been developed by establishing a benchmark of the critical motivational attributes found in current management practices. The framework facilitates devising appropriate schemes by incorporating socio-economic motivational factors in overall decision-making processes. A total of 25 influencing parameters have been identified to study the relationships and impacts of worker motivation in selected construction projects. Based on the user's preferences and knowledge base from past projects, a ranking of these attributes has been established in the order of relative importance in motivating workers to optimum productivity. Statistical analysis such as factor analysis has been performed on these motivational project attributes and four major factors have been extracted. Further analysis indicates that the most critical motivational factor associated with worker productivity is the basic work environment and employment contract, which comprises 12 major subfactors.

[1]  Hans-Jörg Bullinger,et al.  Changes in remuneration practice in production: Success factors of sustainable remuneration systems for innovative concepts of work organization , 2002 .

[2]  Kae H. Chung Motivational theories and practices , 1977 .

[3]  H M Bernstein,et al.  Solving the Innovation Puzzle: Challenges Facing the U.S. Design & Construction Industry , 1996 .

[4]  Steve Y. W. Lam,et al.  Motivation of Survey Employees in Construction Projects , 2003 .

[5]  Raja R. A. Issa,et al.  Management’s Perception of Key Performance Indicators for Construction , 2003 .

[6]  Derek H.T. Walker,et al.  The effect of the workplace on motivation and demotivation of construction professionals , 2000 .

[7]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[8]  V. Vroom Work and motivation , 1964 .

[9]  Colin P. Hargreaves A comparison of economy : wide models of Australia : responses to a ise in labour productivity , 1994 .

[10]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[11]  Gerald E. Ledford,et al.  “How to Keep Me”—REtaining Technical Professionals , 2001 .

[12]  Max Maher Shoura,et al.  Motivation Parameters for Engineering Managers Using Maslow’s Theory , 1999 .

[13]  Richard J. Butler The Economics of Social Insurance and Employee Benefits , 1999 .

[14]  Paul M. Goodrum,et al.  U.S. construction labor productivity trends, 1970-1998 , 2000 .

[15]  Nami Harada Practical approach to motivation of team members : MEH model for praise and reproach ( Human Factors Management) , 2004 .

[16]  N. Allen,et al.  Assessing dissimilarity relations under missing data conditions: evidence from computer simulations. , 2007, The Journal of applied psychology.

[17]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[18]  Eddy M. Rojas,et al.  Labor Productivity Drivers and Opportunities in the Construction Industry , 2003 .

[19]  Andy Field,et al.  Discovering statistics using SPSS, 2nd ed. , 2005 .

[20]  Charles R. Schrader Motivation of Construction Craftsmen , 1972 .

[21]  Charles T. Jahren,et al.  Journal of Construction Engineering and Management , 1983 .

[22]  Ronald Gulezian,et al.  Baseline Determination in Construction Labor Productivity-Loss Claims , 2003 .

[23]  John D. Borcherding,et al.  Improving Productivity in Industrial Construction , 1976 .

[24]  Troy Sarina,et al.  Industrial Legislation in 2005 , 2006 .

[25]  Ben Edwards,et al.  Motivating the British construction industry , 1984 .

[26]  Dean Parham,et al.  Aggregate and Industry Productivity Estimates for Australia , 2006 .

[27]  J. Schermerhorn Management for Productivity , 1984 .

[28]  David E. Booth,et al.  Applied Multivariate Analysis , 2003, Technometrics.

[29]  Holger R. Maier,et al.  Incorporating uncertainty in the PROMETHEE MCDA method , 2003 .

[30]  William F. Maloney Motivation in Construction: A Review , 1981 .

[31]  Freerk A. Lootsma,et al.  The multiplicative AHP, SMART and ELECTRE in a common context , 1997 .

[32]  Mark John Somers,et al.  Assessing Self-Appraisal of Job Performance as an Evaluation Device: Are the Poor Results a Function of Method or Methodology? , 1991 .

[33]  Linda Rhoades,et al.  Does Pay for Performance Increase or Decrease Perceived Self-Determination and Intrinsic Motivation? , 1999 .

[34]  Cindy L. Menches,et al.  Factors Affecting Absenteeism in Electrical Construction , 2005 .

[35]  Jahidul Alum,et al.  Construction productivity: Issues encountered by contractors in Singapore , 1995 .

[36]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .