Web-based Multi-functional Scheduling System for a Distributed Manufacturing Environment
暂无分享,去创建一个
Andrew Y. C. Nee | Yunfeng Zhang | Jerry Y. H. Fuh | H. Z. Jia | Yunfeng Zhang | J. Fuh | A. Nee | H. Jia
[1] Stephen F. Smith,et al. Using Genetic Algorithms to Schedule Flow Shop Releases , 1989, ICGA.
[2] Takeshi Yamada,et al. Conventional Genetic Algorithm for Job Shop Problems , 1991, ICGA.
[3] M. Pallot,et al. Concurrent Enterprising: Toward the Concurrent Enterprise in the Era of the Internet and Electronic Commerce , 1998 .
[4] Fabio Vitali,et al. The World Wide Web as a place to work in , 1998, Proceedings Seventh IEEE International Workshop on Enabling Technologies: Infrastucture for Collaborative Enterprises (WET ICE '98) (Cat. No.98TB100253).
[5] George Q. Huang,et al. Early Supplier Involvement in New Product Development on the Internet: Implementation Perspectives , 2000, Concurr. Eng. Res. Appl..
[6] Lawrence Davis,et al. Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.
[7] Douglas H. Norrie,et al. Multi-agent Mediator architecture for distributed manufacturing , 1996, J. Intell. Manuf..
[8] Xiaoqing Frank Liu,et al. WWW-Based Collaborative System for Integrated Design and Manufacturing , 1999 .
[9] Yugeng Xi,et al. A rolling horizon job shop rescheduling strategy in the dynamic environment , 1997 .
[10] Carsten Huth,et al. Collaborative organization design: a synergy of groupware and Web-based infrastructures and technology , 1998, Proceedings Seventh IEEE International Workshop on Enabling Technologies: Infrastucture for Collaborative Enterprises (WET ICE '98) (Cat. No.98TB100253).
[11] Cihan H. Dagli,et al. A parallel genetic-neuro scheduler for job-shop scheduling problems , 1997 .
[12] Shuichi Fukuda,et al. Internet Service and Maintenance for RP-Oriented Tele-Manufacturing , 1999 .
[13] Chuen-Lung Chen,et al. Genetic algorithms applied to the continuous flow shop problem , 1996 .