Modeling of pressure on retaining structures for underground fill mass

Abstract To retain fresh cemented paste backfill (CPB) (a large fill mass made of man-made fine soils that undergo cementation) in a stope (underground mining excavations), a retaining structure or wall (called a barricade) must be constructed at the base of the stope. Due to the coupled thermo-hydro-mechanical-chemical (THMC) processes that occur in CPB, changes in the total horizontal stress and pore water pressure (PWP) take place with backfilling operations that are flexible, which directly affects the stability of the barricade. Hence, an investigation of the changes and distribution of barricade pressure is crucial for the assessment of the stability of CPB and the barricade. In this paper, an integrated multiphysics model composed of a fully coupled THMC model, a fully coupled multiphysics model that analyzes the consolidation process in CPB and an elastoplastic model that analyzes changes in the interface behavior during the interaction of rock mass/backfill is adopted. The predictive ability of the model is validated by the good agreement between the simulation results and in-situ measurements from a series of field monitoring programs. Then, the validated multiphysics model is used to numerically investigate the changes and spatial distribution of barricade pressure under various conditions (including elapsed time, barricade location and shape, initial temperature, and drainage conditions). The obtained results can provide practical insight into the factors that affect the geotechnical stability of barricade structures.

[1]  L. Cui,et al.  Mechanical and thermal properties of cemented tailings materials at early ages: Influence of initial temperature, curing stress and drainage conditions , 2016 .

[2]  M. Benzaazoua,et al.  Sludge recycling within cemented paste backfill: Study of the mechanical and leachability properties , 2006 .

[3]  M. Fall,et al.  Temperature dependence of the reactivity of cemented paste backfill , 2016 .

[4]  James Doherty,et al.  Investigation of some controllable factors that impact the stress state in cemented paste backfill , 2015 .

[5]  M. Fall,et al.  A contribution to understanding the effects of curing temperature on the mechanical properties of mine cemented tailings backfill , 2010 .

[6]  Andy Fourie,et al.  Coupled two-dimensional finite element modelling of mine backfilling with cemented tailings , 2010 .

[7]  Othman Nasir,et al.  Mechanical Behaviour of the Interface Between Cemented Tailings Backfill and Retaining Structures Under Shear Loads , 2010 .

[8]  Liang Cui,et al.  Multiphysics Model for Consolidation Behavior of Cemented Paste Backfill , 2017 .

[9]  M. Fall,et al.  Coupled Thermochemical Effects on the Strength Development of Slag-Paste Backfill Materials , 2011 .

[10]  Liang Cui,et al.  A coupled thermo-hydro-mechanical-chemical model for underground cemented tailings backfill , 2015 .

[11]  Kevin J. Folliard,et al.  INFLUENCE OF SUPPLEMENTARY CEMENTING MATERIALS ON THE HEAT OF HYDRATION OF CONCRETE , 2003 .

[12]  Mw Grabinsky,et al.  In situ measurements of cemented paste backfill at the Cayeli Mine , 2012 .

[13]  L. Cui,et al.  An evolutive elasto-plastic model for cemented paste backfill , 2016 .

[14]  Andy Fourie,et al.  Numerical Modeling of Cemented Mine Backfill Deposition , 2007 .

[15]  James G. Donovan,et al.  The Effects of Backfilling on Ground Control and Recovery in Thin-Seam Coal Mining , 1999 .

[16]  L. Cui,et al.  Coupled Modeling of the Strength Development and Distribution within Cemented Paste Backfill Structure , 2015 .

[17]  Paul B. Hughes Performance of paste fill fences at Red Lake Mine , 2008 .

[18]  A Marston,et al.  THE THEORY OF EXTERNAL LOADS ON CLOSED CONDUITS IN THE LIGHT OF THE LATEST EXPERIMENTS , 1930 .

[19]  Li Li A method to evaluate the size of backfilled stope barricades made of waste rock , 2009 .

[20]  M. Fall,et al.  Modeling the heat development in hydrating CPB structures , 2009 .

[21]  Mamadou Fall,et al.  Shear behaviour of cemented pastefill-rock interfaces , 2008 .

[22]  Jacques Ouellet,et al.  Cementitious backfill with high sulfur content Physical, chemical, and mineralogical characterization , 1999 .

[23]  R. Veenstra A Design Procedure for Determining the In Situ Stresses of Early Age Cemented Paste Backfill , 2013 .

[24]  James Doherty A numerical study into factors affecting stress and pore pressure in free draining mine stopes , 2015 .

[25]  A. Fourie,et al.  Influence of curing temperature and stress conditions on mechanical properties of cementing paste backfill , 2016 .

[26]  Liang Cui,et al.  Modeling and Simulation of the Consolidation Behaviour of Cemented Paste Backfill , 2015 .

[27]  LiLi,et al.  Effect of drainage and sequential filling on the behavior of backfill in mine stopes , 2014 .

[28]  Tikou Belem,et al.  An overview on the use of paste backfill technology as a ground support method in cut-and-fill mines , 2004 .

[29]  A. Fourie,et al.  Experimental Investigation of Propagation and Transmission of Compressional Stress Waves in Cemented Paste Backfill , 2017 .

[30]  Tikou Belem,et al.  Experimental investigation into the compressive strength development of cemented paste backfill containing Nano-silica , 2016 .

[31]  L. Cui,et al.  Yield stress of cemented paste backfill in sub-zero environments: Experimental results , 2016 .

[32]  M. Aubertin,et al.  Horizontal pressure on barricades for backfilled stopes. Part II: Submerged conditions , 2009 .

[33]  Alireza Ghirian,et al.  Strength evolution and deformation behaviour of cemented paste backfill at early ages: Effect of curing stress, filling strategy and drainage , 2016 .

[34]  M. Fall,et al.  Coupled thermo-hydro-mechanical-chemical behaviour of cemented paste backfill in column experiments Part II: Mechanical, chemical and microstructural processes and characteristics , 2014 .

[35]  Di Wu,et al.  Numerical modelling of thermally and hydraulically coupled processes in hydrating cemented tailings backfill columns , 2014 .

[36]  Li Li,et al.  A numerical evaluation of continuous backfilling in cemented paste backfilled stope through an application of wick drains , 2015 .

[37]  Tikou Belem,et al.  MECHANICAL BEHAVIOUR OF CEMENTED PASTE BACKFILL , 2000 .

[38]  A. M. Gokhale,et al.  A general method for estimation of fracture surface roughness: Part I. Theoretical aspects , 1990 .

[39]  Andy Fourie,et al.  Behavior of Cemented Paste Backfill in Two Mine Stopes: Measurements and Modeling , 2011 .

[40]  Andy Fourie,et al.  Some aspects of the mechanics of arching in backfilled stopes , 2009 .

[41]  Liang Cui,et al.  Multiphysics modeling of arching effects in fill mass , 2017 .