A structured analysis of material requirements planning systems under combined demand and supply uncertainty

Abstract The effects of the presence of both demand and lead time uncertainties on material requirements planning systems performance are investigated. A simulation model of a multi-level product environment is employed to evaluate the influence of these combined uncertainties in a rolling planning horizon. Their interaction with product structure variables, cost ratios and lot-sizing rules is also explored. Finally, by means of statistical analysis of the simulation output, hypotheses relating to various variables and their interactions are formed and tested. The results highlight the significant differences between uncertain and deterministic environments.

[1]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[2]  Randall P. Sadowski,et al.  Introduction to Simulation Using Siman , 1990 .

[3]  Steven A. Melnyk,et al.  Leadtime errors in MRP: the lot-sizing effect , 1985 .

[4]  Luk N. Van Wassenhove,et al.  The effect of engineering changes and demand uncertainty on MRP lot sizing: a case study , 1985 .

[5]  Larry R. Dolinsky,et al.  Adjusting replenishment orders to reflect learning in a material requirements planning environment , 1990 .

[6]  Surendra M. Gupta,et al.  Heuristic and optimal approaches to lot-sizing incorporating backorders: an empirical evaluation , 1992 .

[7]  L. V. Wassenhove,et al.  COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING , 1983 .

[8]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[9]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[10]  G. D. Eppen,et al.  Determining Safety Stock in the Presence of Stochastic Lead Time and Demand , 1988 .

[11]  Eric M. Malstrom,et al.  Computer simulation of lot-sizing algorithms in three-stage multi-echelon inventory systems , 1984 .

[12]  Eisenhower C. Etienne Choosing optimal buffering strategies for dealing with uncertainty in MRP , 1987 .

[13]  Jatinder N. D. Gupta,et al.  OR Practice - Determining Lot Sizes and Resource Requirements: A Review , 1987, Oper. Res..

[14]  B. W. Taylor,et al.  A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .

[15]  Carolina Chang,et al.  The interchangeability of safety stocks and safety lead time , 1985 .

[16]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[17]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[18]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[19]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[20]  Emre A. Veral,et al.  THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT , 1985 .

[21]  Urban Wemmerlöv A time-phased order-point system in environments with and without demand uncertainty: a comparative analysis of non-monetary performance variables , 1986 .

[22]  Jatinder N. D. Gupta,et al.  Determining lot sizes and resource requirements: A review , 1987 .

[23]  Loren Paul Rees,et al.  Integrating the MRP-based control level and the multi-stage shop level of a manufacturing system via network simulation , 1985 .

[24]  Joseph D. Blackburn,et al.  The impact of a rolling schedule in a multi-level MRP system , 1982 .

[25]  W. C. Benton,et al.  PRODUCT STRUCTURE COMPLEXITY AND MULTILEVEL LOT SIZING USING ALTERNATIVE COSTING POLICIES , 1985 .

[26]  D. N. P. Murthy,et al.  MRP with uncertainty: a review and some extensions , 1991 .