Results of the integrated topping cycle MHD generator testing
暂无分享,去创建一个
The results of the Integrated Topping Cycle (ITC) MHD generator tests are presented. This generator is part of a 50 MW{sub t} prototypic powertrain which recently completed proof-of-concept (POC) testing at the U.S. Department of Energy`s Component Development and Integration Facility (CDIF) in Butte, Montana. POC duration testing was carried out at conditions representative of commercial power plant operation, in order to establish component lifetimes and to verify the design performance parameters. Over 500 hours of thermal and power testing was cumulated with the generator hardware before the program funding was terminated. A summary of the MHD generator performance characteristics and hardware evaluations is provided in the paper. A summary of the generator performance throughout the POC test series is presented. Included are comparisons of: (1) plasma electrical conductivities measured early in the Design Verification Test series and during the POC series, (2) measured generator performance with analytical predictions, and (3) internal wall leakage characteristics of the generator channel with and without iron oxide addition. The performance requirement of the ITC program, i.e., the demonstration of 1.5 MW{sub e} power output, was easily achieved. The ITC generator channel, nozzle, and diffuser accumulated more than 300 hours at nominal power conditions.more » The prototypic hardware performed well throughout the POC test series. Some problems did arise during the tests. but they were not life-threatening to the MHD generator. Corrective measures were implemented; they will be discussed in the full paper. The physical condition of the overall generator channel at the end of POC tests is good.« less