Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches

Abstract It has become increasingly important in the last few years to develop rapid, dynamic, responsive and reconfigurable manufacturing processes and systems. This is because manufacturing enterprises are now being forced to develop and constantly improve their production systems so that they can quickly and economically react to unpredictable conditions such as varying production volumes and product variants with small lot size, high quality and low costs. One effective method to achieve this is to create a more flexible, highly skilled and agile workforce capable to perform multiple or all the required tasks in a production area where the system can be reconfigured easily as needed to accommodate changes of production requirement on a daily or weekly basis. This paper presents a study of a so-called linear walking worker assembly line based on a combination of computer simulation and mathematical analysis. The linear walking worker assembly line is a flexible assembly system where each worker travels down the line carrying out each assembly task at each station; and each worker accomplishes the assembly of a unit from start to finish. This design attempts to combine the flexibility of the U-shaped moving worker assembly cell with the efficiency of the conventional fixed worker assembly line. The paper aims to evaluate one critical factor of in-progress waiting time that affects the overall system performance providing a dynamic simulation outlook as well as an insight into the mechanism of such a flexible and reconfigurable manufacturing system.

[1]  F. Balle,et al.  Feel the force of flexible manpower , 2005 .

[2]  Katsuhisa Ohno,et al.  Separate and carousel type allocations of workers in a U-shaped production line , 2003, Eur. J. Oper. Res..

[3]  Wallace J. Hopp,et al.  Serial Agile Production Systems with Automation , 2005, Oper. Res..

[4]  Tomas Engström,et al.  Data collection and analysis of manual work using video recording and personal computer techniques , 1997 .

[5]  Alexandre Dolgui,et al.  A survey of the self-balancing production lines (“bucket brigades”) , 2005, J. Intell. Manuf..

[6]  Helmut Bley,et al.  Appropriate Human Involvement in Assembly and Disassembly , 2004 .

[7]  John O. McClain,et al.  Self-buffering, self-balancing, self-flushing production lines , 1996 .

[8]  Hoda A. ElMaraghy,et al.  Transition of interarrival time patterns between automated and manual configurations of assembly systems , 2007 .

[9]  Leonid A. Bunimovich,et al.  Dynamics of Two- and Three-Worker "Bucket Brigade" Production Lines , 1999, Oper. Res..

[10]  Manfredi Bruccoleri,et al.  Distributed intelligent control of exceptions in reconfigurable manufacturing systems , 2003 .

[11]  Y. Tang *,et al.  Integrated design approach for virtual production line-based reconfigurable manufacturing systems , 2004 .

[12]  A. Galip Ulsoy,et al.  Reconfigurable manufacturing systems: Key to future manufacturing , 2000, J. Intell. Manuf..

[13]  Wallace J. Hopp,et al.  Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..

[14]  Tim Baines,et al.  Improving the design process for factories: Modeling human performance variation , 2005 .

[15]  Alexandre Dolgui,et al.  Some new results on the analysis and simulation of bucket brigades (self-balancing production lines) , 2009 .

[16]  G. Meng,et al.  Reconfigurable layout problem , 2004 .

[17]  Xinjun Sheng,et al.  Modelling strategies for reconfigurable assembly systems , 2003 .

[18]  Qian Wang,et al.  Determining numbers of workstations and operators for a linear walking-worker assembly line , 2007, Int. J. Comput. Integr. Manuf..

[19]  Qian Wang,et al.  Key issues and developments in modelling and simulation-based methodologies for manufacturing systems analysis, design and performance evaluation , 2005 .