Managing information flow in construction supply chains

The purpose of this paper is to provide a better understanding of construction procurement within the supply chain management framework and develop a model for information flow. This paper adheres to the supply chain perspective and integration as theoretical point of departure, typically the role that information plays in a complex network such as construction procurement. The co‐ordination within partners and the integration across partners are critical in effective project management. Sharing information is a key component for tight integration to optimize the chain‐wide performance. It helps produce highest quality, low cost and minimum time to service. The tender offer from the procurer or invitation from a supplier triggers the requirement process. In response to the requirements there has to be an opposite flow of information, termed the fulfilment flow in the model described. The requirement information from a procurer is broken down to the project requirements for various partners in the project. Once the supply chain is identified in the postcontracting phase, information regarding specific tasks, materials, and so on, are communicated to the project partners. Information must be managed to bring in value. The quality of information received, the timeliness of the manner it is received and the costeffectiveness in obtaining the information determine the efficiency of a project partner. Another classification considered is that of the changing role of the partner with regard to information handling, i.e., the project partner as a recipient, decision‐maker and communicator of information. All these factors jointly contribute to increasing efficiency in construction procurement. This framework needs to be explored in future research to define subsequent steps in construction supply chain management, as the challenge is to adapt a totally integrated supply chain.

[1]  George Stukhart Construction Materials Management , 1995 .

[2]  Mark J. Clayton,et al.  The impact of information technology in design and construction: the owner's perspective , 1998 .

[3]  Gregory A. Howell,et al.  WHAT IS LEAN CONSTRUCTION - 1999 , 1999 .

[4]  R. D. Buzzell,et al.  Channel Partnerships Streamline Distribution , 1995 .

[5]  Mohan M. Kumaraswamy,et al.  Linking procurement systems to project priorities , 1998 .

[6]  D. Lambert,et al.  Issues in Supply Chain Management , 2000 .

[7]  Lauri Koskela,et al.  Roles of supply chain management in construction , 1999 .

[8]  D. Towill,et al.  Supply chain migration from lean and functional to agile and customised , 2000 .

[9]  Eric Sandelands,et al.  Strategic logistics management , 1994 .

[10]  David Gann,et al.  Building Innovation: Complex Constructs in a Changing World , 2000 .

[11]  Michael Murray,et al.  Construction procurement : redefining the contours of organizational structures in procurement , 2001 .

[12]  Peter E.D. Love,et al.  Evaluation of IT costs in construction , 2001 .

[13]  Hau L. Lee,et al.  Information sharing in a supply chain , 2000, Int. J. Manuf. Technol. Manag..

[14]  Ekambaram Palaneeswaran,et al.  Reforging construction supply chains:: a source selection perspective , 2001 .

[15]  Daniel T. Jones,et al.  From lean production to the lean enterprise , 1994 .

[16]  R. Müller,et al.  On the nature of the project as a temporary organization , 2003 .

[17]  D. Lambert,et al.  SUPPLY CHAIN MANAGEMENT -- MORE THAN A NEW NAME FOR LOGISTICS , 1997 .

[18]  T. Davis Effective supply chain management , 2020, Strategic Direction.

[19]  Andrew R.J. Dainty,et al.  Client‐led strategies for construction supply chain improvement , 2004 .

[20]  Roger W. Schmenner Production/Operations Management: From the Inside Out , 1993 .

[21]  Glenn Ballard,et al.  What Kind of Production Is Construction , 1998 .

[22]  A. B. Ngowi,et al.  Is construction procurement a key to sustainable development , 1998 .

[23]  Mohammed Fadhil Dulaimi,et al.  Empowering innovative improvements through creative construction procurement , 2001 .