Real time part dispatch in flexible assembly test and manufacturing systems
暂无分享,去创建一个
[1] Stanley B. Gershwin,et al. Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.
[2] Dimitri P. Bertsekas,et al. Dynamic Programming and Stochastic Control , 1977, IEEE Transactions on Systems, Man, and Cybernetics.
[3] Stanley B. Gershwin,et al. Performance of hierarchical production scheduling policy , 1984 .
[4] R. Akella,et al. Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.