Real time part dispatch in flexible assembly test and manufacturing systems

[1]  Stanley B. Gershwin,et al.  Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.

[2]  Dimitri P. Bertsekas,et al.  Dynamic Programming and Stochastic Control , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[3]  Stanley B. Gershwin,et al.  Performance of hierarchical production scheduling policy , 1984 .

[4]  R. Akella,et al.  Optimal control of production rate in a failure prone manufacturing system , 1985, 1985 24th IEEE Conference on Decision and Control.