Scheduling problems with random processing times under expected earliness/tardiness costs
暂无分享,去创建一个
John R. Birge | George Yin | G. Yin | J. Birge | X. Qi | X. D. Qi
[1] Xiaoqiang Cai,et al. Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties , 1996 .
[2] Qing Zhang,et al. Recent Advances in Control and Optimization of Manufacturing Systems , 1996 .
[3] Samuel Eilon,et al. Minimising Waiting Time Variance in the Single Machine Problem , 1977 .
[4] John R. Birge,et al. Using second moment information in stochastic scheduling , 1996 .
[5] Frank G. Forst. Stochastic Sequencing on One Machine with Earliness and Tardiness Penalties , 1993 .
[6] Xiaoqiang Cai,et al. Scheduling stochastic jobs with asymmetric earliness and tardiness penalties , 1997 .
[7] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[8] William L. Maxwell,et al. Theory of scheduling , 1967 .
[9] John R. Birge,et al. Introduction to Stochastic Programming , 1997 .
[10] A.H.G. Rinnooy Kan,et al. Single‐machine scheduling subject to stochastic breakdowns , 1990 .
[11] Emanuel Parzen,et al. Stochastic Processes , 1962 .
[12] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[13] M. Raghavachari,et al. Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties , 1993, Oper. Res..
[14] M. Raghavachari,et al. The single‐machine absolute‐deviation early‐tardy problem with random completion times , 1996 .
[15] Kevin D. Glazebrook,et al. Bounds on optimal values in stochastic scheduling , 1997, Oper. Res. Lett..
[16] T.C.E. Cheng,et al. Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine , 1991 .
[17] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..