Influence of best value procurement on design-build projects: a grounded theory study

[1]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[2]  Arindam Gan Chowdhury,et al.  Integrated project delivery implementation framework for water and wastewater treatment plant projects , 2019, Engineering, Construction and Architectural Management.

[3]  Arthur G. Stephenson,et al.  CEO's Corner: It's About People , 2002 .

[4]  C. Duffield,et al.  Relationships among Risk Management, Partnering, and Contractor Capability in International EPC Project Delivery , 2016 .

[5]  Jardar Lohne,et al.  Best Value Procurement - The Practical Approach In The Netherlands , 2017 .

[6]  Arindam Gan Chowdhury,et al.  Enhancement of IPD Characteristics as Impelled by Information and Communication Technology , 2019 .

[7]  Tarek Zayed,et al.  Best-Value Model Based on Project Specific Characteristics , 2008 .

[8]  G. Edward Gibson,et al.  Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement , 2016 .

[9]  Peter E.D. Love,et al.  Co-operative benchmarking: a tool for partnering excellence in construction , 2001 .

[10]  R. Awwad,et al.  Owner's Perspective on Evolution of Bid Prices under Various Price-Driven Bid Selection Methods , 2019, J. Comput. Civ. Eng..

[11]  Brian C. Lines,et al.  Does Best Value Procurement Cost More than Low-Bid? A Total Project Cost Perspective , 2020, International Journal of Construction Education and Research.

[12]  W. Hughes,et al.  Collaborative incentive contracts: stimulating competitive behaviour without competition , 2014 .

[13]  Wiebe Witteveen,et al.  Performance Indicators in the Best Value Approach , 2013 .

[14]  Rebecca S. Natow The use of triangulation in qualitative studies employing elite interviews , 2020, Qualitative Research.

[15]  M. Kumaraswamy,et al.  Joint risk management through transactionally efficient relational contracting , 2002 .

[16]  Sai On Cheung,et al.  Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong , 2004 .

[17]  L. Fabrigar,et al.  Theory of Planned Behavior , 2017 .

[18]  Robert Leicht,et al.  An alternative classification of project delivery methods used in the United States building construction industry , 2016 .

[19]  Justin Reginato,et al.  Impact of Design Changes on Virtual Design and Construction Performance for Electrical Contractors , 2018 .

[20]  Kenneth T. Sullivan,et al.  Using Best-Value Procurement to Measure the Impact of Initial Risk-Management Capability on Qualitative Construction Performance , 2017 .

[22]  Wen-der Yu,et al.  Pricing Strategy for Best Value Tender , 2013 .

[23]  Bryan Franz,et al.  Project Impacts of Specialty Mechanical Contractor Design Involvement in the Health Care Industry: Comparative Case Study , 2013 .

[24]  Mohammadreza Hafezi,et al.  Collaborative Procurement in Construction Projects Performance Measures, Case Study: Partnering in Iranian Construction Industry , 2014 .

[25]  George Jergeas,et al.  Benefits of Constructability on Construction Projects , 2001 .

[26]  Anthony P. Ammeter,et al.  Leadership, Team Building, and Team Member Characteristics in High Performance Project Teams , 2002 .

[27]  Keith R. Molenaar,et al.  Practices for Developing Transparent Best Value Selection Procedures , 2015 .

[28]  I. Ajzen The theory of planned behavior , 1991 .

[29]  Hans Voordijk,et al.  Barriers to realizing a stewardship relation between client and vendor: the Best Value approach , 2015 .

[30]  Wen-der Yu,et al.  Best Value or Lowest Bid? A Quantitative Perspective , 2012 .

[31]  Amrik S. Sohal,et al.  Communication, coordination, decision-making and knowledge-sharing: a case study in construction management , 2019, J. Knowl. Manag..

[32]  Wayne F. Cascio,et al.  E-Leadership and Virtual Teams , 2008, IEEE Engineering Management Review.

[33]  Peter Raisbeck,et al.  Assessing integrated project delivery: A comparative analysis of ipd and alliance contracting procurement routes , 2010 .

[34]  Keith R. Molenaar,et al.  Implementing Best-Value Procurement for Design–Bid–Build Highway Projects , 2016 .

[35]  Gayan Wedawatta,et al.  Establishing a Link between Contractor Selection Strategy and Project Outcomes: Simulation Study , 2019, Journal of Construction Engineering and Management.

[36]  Keith R. Molenaar,et al.  Comparative analysis between integrated project delivery and lean project delivery , 2019, International Journal of Project Management.