Effects of project’s physical characteristics on cost deviation in road construction

Abstract This study is conducted to investigate the effect of projects’ physical characteristics on cost deviation in road construction using data from road construction projects awarded in the West Bank – Palestine over the years 2007–2010. The study is based on a sample of 74 road construction projects. Based on these data, regression models are developed. A questionnaire survey is also conducted to determine the impact of projects’ physical characteristics on cost deviation in road construction. The questionnaire survey included 14 owners, 30 contractors, and 25 consultants. The considered characteristics are: project size (i.e. small, medium, and large), estimated cost, road length, road width, terrain conditions, soil and rock suitability, and soil and rock drill ability. The results reveal that the average of cost deviation in road construction is 16.73%, ranging from −20.33% to 56.01%. The correlation between cost deviation in road construction projects and the above mentioned parameters is investigated.

[1]  Charles T. Jahren,et al.  Predictors of Cost‐Overrun Rates , 1990 .

[2]  Ali A. Shash,et al.  Factors affecting a contractor's mark-up size decision in Saudi Arabia , 1992 .

[3]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .

[4]  S. Mohamed,et al.  Causes of contractor's business failure in developing countries: the case of Palestine , 2006 .

[5]  Henry J Rowland The Causes and Effects of Change Orders on the Construction Process. , 1981 .

[6]  N. Kartam,et al.  Risk and its management in the Kuwaiti construction industry: a contractors’ perspective , 2001 .

[7]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[8]  Dennis A. Randolph,et al.  Using Risk Management Techniques to Control Contract Costs , 1987 .

[9]  A. Omoregie,et al.  Infrastructure delays and cost escalation: Causes and effects in Nigeria , 2006 .

[10]  Zaitoun Shadeed Al-Khaldi Factors affecting the accuracy of construction costs estimating in Saudi Arabia , 1990 .

[11]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[12]  Koleola Tunwase Odusami,et al.  Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .

[13]  Ibrahim Ahmad K. Mahamid Cost and time overrun in road construction : Magnitude, Causes and Cost Estimating Models , 2011 .

[14]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[15]  Robert J. Chapman,et al.  The controlling influences on effective risk identification and assessment for construction design management , 2001 .

[16]  Akintola Akintoye,et al.  Analysis of factors influencing project cost estimating practice , 2000 .

[17]  Koleola T. Odusami,et al.  Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in Nigeria , 2008 .

[18]  Fetene Nega CAUSES AND EFFECTS OF COST OVERRUN ON PUBLIC BUILDING CONSTRUCTION PROJECTS IN ETHIOPIA , 2008 .

[19]  James Odeck,et al.  Cost overruns in road construction--what are their sizes and determinants? , 2004 .