Performance measurement based on a total quality approach
暂无分享,去创建一个
[1] Hyung-Woo Park,et al. An efficient scheduling algorithm for the hot coil making in the steel mini-mill , 2002 .
[2] Andrew Starr,et al. New Trends and the Role of TPM , 2007 .
[3] Õrjan Ljungberg,et al. Measurement of overall equipment effectiveness as a basis for TPM activities , 1998 .
[4] Roger W. Schmenner,et al. Performance Measures: Gaps, False Alarms, and the “Usual Suspects” , 1994 .
[5] N. Anantharaman,et al. Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system , 2006 .
[6] Andrew Starr,et al. Evaluation of overall equipment effectiveness based on market , 2010 .
[7] I. Assaf,et al. Steel production schedule generation , 1997 .
[8] Sanja Petrovic,et al. Utility and stability measures for agent-based dynamic scheduling of steel continuous casting , 2003, 2003 IEEE International Conference on Robotics and Automation (Cat. No.03CH37422).
[9] Kanthi M.N. Muthiah,et al. Automating factory performance diagnostics using overall throughput effectiveness (OTE) metric , 2008 .
[10] A.J. de Ron,et al. Equipment effectiveness: OEE revisited , 2005, IEEE Transactions on Semiconductor Manufacturing.
[11] Paul Martin Gibbons,et al. Improving overall equipment efficiency using a Lean Six Sigma approach , 2006 .
[12] Andrew Starr,et al. Integrated Equipment Effectiveness , 2008 .
[13] Terry Hill,et al. Manufacturing Strategy: Text and Cases , 1993 .
[14] Masaji Tajiri,et al. TPM Implementation: A Japanese Approach , 1992 .
[15] Marcello Braglia,et al. Overall equipment effectiveness of a manufacturing line (OEEML) , 2008 .
[16] Juha-Matti Lehtonen,et al. Combining optimisation and simulation for steel production scheduling , 2005 .
[17] Ho Soo Lee,et al. Primary production scheduling at steelmaking industries , 1996, IBM J. Res. Dev..