A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry

Abstract This paper proposes a framework for the qualitative and quantitative characterization of maintenance work to support Maintenance, Repair, and Overhaul (MRO) organizations in performing capacity planning and scheduling. A quantitative assessment based on 372 maintenance projects collected at a Portuguese aircraft MRO confirms that a significant part of the maintenance work is stochastic in nature, given the amount of unscheduled maintenance. The proposed framework, entitled FRamework for Aircraft Maintenance Estimation (FRAME), is intended to allow MROs in managing this uncertainty throughout the maintenance planning process and comprises for that end a set of requirements for data treatment and a method for data analysis. The established requirements address important shortcomings found in the collected data that prevented the use of maintenance data for capacity planning and scheduling as is. The developed method for data analysis, entitled 3-Dimensional Maintenance Data Analysis (3D-MDA), is based on a space-time-skill coordinate system in which indicators are calculated from historical data to comprehensively characterize the expected maintenance work. Space refers to the aircraft work zone where maintenance is performed, time refers to the project work phase when maintenance is performed, and skill refers to the type of technicians required for maintenance to be performed. The established coordinates address the limitations of reviewed techniques by allowing accurate estimations of required resources for capacity planning and an extended range of constraints for maintenance scheduling. Being generic in nature, FRAME is applicable to maintenance in other industries, or even to other activities with due adaptations.

[1]  Peter Nyhuis,et al.  Reliable Capacity Planning Despite Uncertain Disassembly, Regeneration and Reassembly Workloads by Using Statistical and Mathematical Approaches – Validation in Subsidiaries of a Global MRO Company with Operations in Asia, Europe and North America☆ , 2014 .

[2]  D. N. Prabhakar Murthy,et al.  Data management in maintenance outsourcing , 2015, Reliab. Eng. Syst. Saf..

[3]  Garrison W. Greenwood,et al.  Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms , 2007, Eur. J. Oper. Res..

[4]  Ta-Hui Yang,et al.  Airline short-term maintenance manpower supply planning , 2004 .

[5]  Tarek Zayed,et al.  Optimized acceleration of repetitive construction projects , 2014 .

[6]  Peter Nyhuis,et al.  Decision models for capacity planning in a regeneration environment , 2014 .

[7]  Hh Harry Martin,et al.  Contracting out maintenance and a plan for future research , 1997 .

[8]  Erik Demeulemeester,et al.  Integrated staffing and scheduling for an aircraft line maintenance problem , 2013, Comput. Oper. Res..

[9]  Liliane Pintelon,et al.  Development of a maintenance performance measurement framework—using the analytic network process (ANP) for maintenance performance indicator selection , 2014 .

[10]  Adel A. Ghobbar,et al.  Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model , 2003, Comput. Oper. Res..

[11]  Gang Chen,et al.  Assigning licenced technicians to maintenance tasks at aircraft maintenance base: a bi-objective approach and a Chinese airline application , 2017, Int. J. Prod. Res..

[12]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming (Springer Series in Operations Research and Financial Engineering) , 2006 .

[13]  Erik Demeulemeester,et al.  Workforce Planning Incorporating Skills: State of the Art , 2014, Eur. J. Oper. Res..

[14]  M. Bazargan-Lari,et al.  A simulation approach to manpower planning , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..

[15]  Ta-Hui Yang,et al.  An airline maintenance manpower planning model with flexible strategies , 2003 .

[16]  Salih O. Duffuaa,et al.  Maintenance Forecasting and Capacity Planning , 2009 .

[17]  Aditya Parida,et al.  Maintenance Productivity and Performance Measurement , 2009 .

[18]  M. S. Spencer,et al.  An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .

[19]  Premaratne Samaranayake,et al.  Development of engineering structures for scheduling and control of aircraft maintenance , 2002 .

[20]  Ludo Gelders,et al.  Development of maintenance function performance measurement framework and indicators , 2011 .

[21]  Paul R. Garvey,et al.  Analytical Methods for Risk Management: A Systems Engineering Perspective , 2008 .

[22]  Srinivas Kumar Pinjala,et al.  An empirical investigation on the relationship between business and maintenance strategies , 2006 .

[23]  Erik Demeulemeester,et al.  A three-stage approach for aircraft line maintenance personnel rostering using MIP, discrete event simulation and DEA , 2013, Expert Syst. Appl..

[24]  Erik Demeulemeester,et al.  Personnel scheduling: A literature review , 2013, Eur. J. Oper. Res..

[25]  Kenneth R. Baker,et al.  PERT 21: Fitting PERT/CPM for use in the 21st century , 2012 .

[26]  Aris A. Syntetos,et al.  On the categorization of demand patterns , 2005, J. Oper. Res. Soc..

[27]  Rommert Dekker,et al.  On the impact of optimisation models in maintenance decision making: the state of the art , 1998 .

[28]  Umar M. Al-Turki,et al.  Maintenance Planning and Scheduling , 2009 .

[29]  Uday Kumar,et al.  On aircraft scheduled maintenance program development , 2010 .

[30]  Walid El Moudani,et al.  A dynamic approach for aircraft assignment and maintenance scheduling by airlines , 2000 .

[31]  Peter Nyhuis,et al.  Validation of data fusion as a method for forecasting the regeneration workload for complex capital goods , 2013, Prod. Eng..

[32]  Qiang Sun,et al.  A double-level combination approach for demand forecasting of repairable airplane spare parts based on turnover data , 2017, Comput. Ind. Eng..

[33]  Adolfo Crespo Márquez,et al.  Contemporary maintenance management: process, framework and supporting pillars , 2006 .

[34]  Ângelo Palos Teixeira,et al.  Valuing data in aircraft maintenance through big data analytics: A probabilistic approach for capacity planning using Bayesian networks , 2019, Comput. Ind. Eng..

[35]  Kenneth R. Baker,et al.  Principles of Sequencing and Scheduling , 2018 .

[36]  Dimitris Bertsimas,et al.  Dynamic resource allocation: A flexible and tractable modeling framework , 2014, Eur. J. Oper. Res..

[37]  H. Yen,et al.  Aligning ERP implementation with competitive priorities of manufacturing firms: An exploratory study , 2004 .

[38]  Dirk Cattrysse,et al.  Joint maintenance and inventory optimization systems: A review , 2013 .

[39]  Stephan Staudacher,et al.  Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance , 2014 .

[40]  Garrison W. Greenwood,et al.  Workforce-constrained Preventive Maintenance Scheduling Using Evolution Strategies , 2000, Decis. Sci..

[41]  Erik Demeulemeester,et al.  Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics , 2012, Interfaces.

[42]  C. W. Gits Design of maintenance concepts , 1992 .

[43]  Marc Salomon,et al.  Planning the Size and Organization of KLM's Aircraft Maintenance Personnel , 1994 .

[44]  Salih O. Duffuaa,et al.  Mathematical programming approaches for the management of maintenance planning and scheduling , 1997 .

[45]  Premaratne Samaranayake Current practices and problem areas in aircraft maintenance planning and scheduling : interfaced/integrated system perspective , 2006 .

[46]  H. H. Martin,et al.  Control of service parts , 1999 .

[47]  Erik Demeulemeester,et al.  A Model Enhancement Heuristic for Building Robust Aircraft Maintenance Personnel Rosters with Stochastic Constraints , 2012, Eur. J. Oper. Res..

[48]  Erik Demeulemeester,et al.  A Two-Stage Mixed Integer Programming Approach for Optimizing the Skill Mix and Training Schedules for Aircraft Maintenance , 2015 .

[49]  Adel A. Ghobbar,et al.  The material requirements planning system for aircraft maintenance and inventory control: a note , 2004 .

[50]  George Chryssolouris,et al.  An approach to operational aircraft maintenance planning , 2010, Decis. Support Syst..

[51]  Rommert Dekker,et al.  Maintenance and Production: A Review of Planning Models , 2008 .

[52]  Nima Safaei,et al.  Workforce-constrained maintenance scheduling for military aircraft fleet: a case study , 2011, Ann. Oper. Res..

[53]  Mandyam M. Srinivasan,et al.  Warner Robins Air Logistics Center Streamlines Aircraft Repair and Overhaul , 2007, Interfaces.

[54]  Albert Corominas,et al.  A review of mathematical programming models for strategic capacity planning in manufacturing , 2014 .

[55]  S. O. Duffuaa,et al.  An integrated simulation model for effective planning of maintenance operations for Saudi Arabian Airlines (SAUDIA) , 1999 .

[56]  J. Christopher Beck,et al.  Scheduling an Aircraft Repair Shop , 2011, ICAPS.

[57]  Raul Poler,et al.  Models for production planning under uncertainty: A review ☆ , 2006 .

[58]  Claver Diallo,et al.  Integrated Spare Parts Management , 2009 .

[59]  Philip A. Scarf,et al.  On the application of mathematical models in maintenance , 1997 .

[60]  Wenbin Wang,et al.  A stochastic model for joint spare parts inventory and planned maintenance optimisation , 2012, Eur. J. Oper. Res..

[61]  Kevin W. Li,et al.  Efficient aircraft spare parts inventory management under demand uncertainty , 2015 .

[62]  Hans Löfsten,et al.  Measuring maintenance performance – in search for a maintenance productivity index , 2000 .

[63]  D. N. P. Murthy,et al.  MRP with uncertainty: a review and some extensions , 1991 .

[64]  Judea Pearl,et al.  Probabilistic reasoning in intelligent systems - networks of plausible inference , 1991, Morgan Kaufmann series in representation and reasoning.

[65]  Peter Kipruto Chemweno,et al.  Development of a risk assessment selection methodology for asset maintenance decision making: An analytic network process (ANP) approach , 2015 .

[66]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[67]  Mustapha Nourelfath,et al.  Integrated spare parts logistics and operations planning for maintenance service providers , 2014 .

[68]  Adel A. Ghobbar,et al.  Sources of intermittent demand for aircraft spare parts within airline operations , 2002 .

[69]  Ananth V. Iyer,et al.  Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies , 2006, Oper. Res..

[70]  Hesham K. Alfares Aircraft maintenance workforce schedulingA case study , 1999 .

[71]  Nima Safaei,et al.  Aircraft routing with generalized maintenance constraints , 2017, Omega.

[72]  Ali Haghani,et al.  An optimization model for aircraft maintenance scheduling and re-assignment , 2003 .

[73]  Marc Salomon,et al.  A DSS for capacity planning of aircraft maintenance personnel , 1991 .

[74]  Frank W. Ciarallo,et al.  Reliability and operations: Keys to lumpy aircraft spare parts demands , 2016 .

[75]  Premaratne Samaranayake,et al.  Aircraft maintenance planning and scheduling : an integrated framework , 2012 .

[76]  Mauro Gamberi,et al.  Managing Lumpy Demand for Aircraft Spare Parts , 2005 .

[77]  Ruud H. Teunter,et al.  A two-step method for forecasting spare parts demand using information on component repairs , 2012, Eur. J. Oper. Res..

[78]  J. Moubray Reliability-Centered Maintenance , 1991 .