THE CORE-LOC: OPTIMIZED CONCRETE ARMOR
暂无分享,去创建一个
[1] Jeffrey A. Melby,et al. DOLOS DESIGN USING RELIABILITY METHODS , 1993 .
[2] James Rosati,et al. Stresses in Dolos Armor Units Due to Waves , 1990 .
[3] Jeffrey A. Melby. Dolos design procedure based on Crescent City prototype data / by Jeffrey A. Melby ; prepared for U.S. Army Corps of Engineers. , 1993 .
[4] Dennis G. Markle,et al. Crescent City Instrumented Model Dolos Study , 1990 .
[5] Jeffrey A. Melby,et al. Concrete Armor Unit Performance in Light of Recent Research Results , 1995 .
[6] Jeffrey A. Melby,et al. Continued Monitoring of 42-Ton Dolos Movements and Static Stresses at Crescent City , 1990 .
[7] Gary L. Howell. MEASUREMENTS OF FORCES ON DOLOS ARMOR UNITS AT PROTOTYPE SCALE , 1988 .
[8] Jeffrey A. Melby,et al. THE LARGE SCALE DOLOS FLUME STUDY , 1995 .
[9] Jeffrey A. Melby,et al. MOVEMENT AND STATIC STRESS IN DOLOSSE: SIX YEARS OF FIELD MONITORING AT CRESCENT CITY , 1993 .
[10] R. D. Scott,et al. A UNIQUE INSTRUMENTATION SCHEME FOR MEASURING LOADS IN MODEL DOLOS UNITS , 1986 .
[11] K. Kobayashi,et al. PROTOTYPE TESTING OF DOLOSSE TO DESTRUCTION , 1982 .
[12] Hans F. Burcharth,et al. Full-scale dynamic testing of Dolosse to destruction , 1980 .
[13] Jeffrey A. Melby,et al. Scale and Modeling Effects in Concrete Armor Experiments , 1994 .
[14] J. A. Melby. An Overview of the Crescent City Dolos Structural Design Procedure , 1990 .
[15] Y. Goda,et al. ESTIMATION OF INCIDENT AND REFLECTED WAVES IN RANDOM WAVE EXPERIMENTS , 1976 .