THE CORE-LOC: OPTIMIZED CONCRETE ARMOR

This paper outlines the development and initial testing of a new optimized armor shape, called CORE-LOC, that balances and optimizes engineering performance features such as hydraulic stability, strength, and layer porosity. The new shape has significantly reduced design stresses over many existing shapes, yet has superior interlocking and therefore greater stability. The unit has internal maximum tensile stress levels of approximately half that of dolosse and, therefore, should not need reinforcement. For over 1000 flume tests, the core-loc has demonstrated two-dimensional no-damage stability numbers over 7 and Hudson stability coefficients over 250. In nearly all tests, the core-loc layer could not be damaged up to the wave height-period capacities of the flumes. A site-specific three-dimensional stability test of the proposed Noyo, California, offshore breakwater showed a stable no-damage stability number of 2.7 for Hs or a Hudson stability coefficient of 13 when the core-loc armor layer was exposed to repeated attack of a very severe design-level storm. The unit has been designed to be used alone or as a repair unit for dolosse. Core-loc-repaired dolos model slopes showed improved stability over the original dolos slopes. Finally, through reduced volumes, the core-loc layer is substantially more economical than all other commonly-used randomly-placed armor.

[1]  Jeffrey A. Melby,et al.  DOLOS DESIGN USING RELIABILITY METHODS , 1993 .

[2]  James Rosati,et al.  Stresses in Dolos Armor Units Due to Waves , 1990 .

[3]  Jeffrey A. Melby Dolos design procedure based on Crescent City prototype data / by Jeffrey A. Melby ; prepared for U.S. Army Corps of Engineers. , 1993 .

[4]  Dennis G. Markle,et al.  Crescent City Instrumented Model Dolos Study , 1990 .

[5]  Jeffrey A. Melby,et al.  Concrete Armor Unit Performance in Light of Recent Research Results , 1995 .

[6]  Jeffrey A. Melby,et al.  Continued Monitoring of 42-Ton Dolos Movements and Static Stresses at Crescent City , 1990 .

[7]  Gary L. Howell MEASUREMENTS OF FORCES ON DOLOS ARMOR UNITS AT PROTOTYPE SCALE , 1988 .

[8]  Jeffrey A. Melby,et al.  THE LARGE SCALE DOLOS FLUME STUDY , 1995 .

[9]  Jeffrey A. Melby,et al.  MOVEMENT AND STATIC STRESS IN DOLOSSE: SIX YEARS OF FIELD MONITORING AT CRESCENT CITY , 1993 .

[10]  R. D. Scott,et al.  A UNIQUE INSTRUMENTATION SCHEME FOR MEASURING LOADS IN MODEL DOLOS UNITS , 1986 .

[11]  K. Kobayashi,et al.  PROTOTYPE TESTING OF DOLOSSE TO DESTRUCTION , 1982 .

[12]  Hans F. Burcharth,et al.  Full-scale dynamic testing of Dolosse to destruction , 1980 .

[13]  Jeffrey A. Melby,et al.  Scale and Modeling Effects in Concrete Armor Experiments , 1994 .

[14]  J. A. Melby An Overview of the Crescent City Dolos Structural Design Procedure , 1990 .

[15]  Y. Goda,et al.  ESTIMATION OF INCIDENT AND REFLECTED WAVES IN RANDOM WAVE EXPERIMENTS , 1976 .