Using Simulation to Solve Design and Operational Problems
暂无分享,去创建一个
[1] B. L. Davies,et al. Planned flexibility: the key to improved production , 1989 .
[2] S. Gershwin,et al. Reliability in flexible manufacturing systems , 1979, 1979 18th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[3] Bernard J. Schroer,et al. Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer , 1985 .
[4] Jean G. Vaucher. A “WAIT UNTIL” algorithm for general purpose simulation languages , 1973, WSC '73.
[5] Thomas J. Schriber,et al. Simulation Using GPSS , 1974 .
[6] Graham Birtwistle,et al. Discrete event modelling on SIMULA , 1987 .
[7] Robert T. Barrett,et al. A SLAM II simulation study of a simplified flow shop , 1986, Simul..
[8] G. Spur. Growth, crisis and future of the factory , 1984 .
[9] Charles R. Standridge,et al. Performing simulation projects with The Extended Simulation System (TESS) , 1985 .
[10] Berth Eklundh,et al. SIMULA-a way of thinking , 1979, WSC '79.
[11] John E. Lenz. Mast a simulation tool for designing computerized metalworking factories , 1983 .
[12] S. C. Mathewson,et al. The Application of Program Generator Software and Its Extensions to Discrete Event Simulation Modeling , 1984 .
[13] B. L. Davies,et al. Planning for just-in-time production , 1989 .
[14] Didier Dubois,et al. A mathematical model of a flexible manufacturing system with limited in-process inventory , 1983 .
[15] Homer Rahnejat,et al. Simulation aids design for flexible automation , 1986 .
[16] Simon Peck. Intermediate Generality Simulation Software for Production , 1985 .
[17] Fred Maryanski. Digital computer simulation , 1980 .
[18] Jeff Maguire,et al. Using simulation to solve problems , 1977 .
[19] James Solberg. Analytical performance evaluation for the design of flexible manufacturing systems , 1978, 1978 IEEE Conference on Decision and Control including the 17th Symposium on Adaptive Processes.
[20] Graham Birtwistle. A system for discrete event modelling on SIMULA , 1979 .
[21] B. L. Davies,et al. The analysis of flexible manufacturing systems for reliability , 1986 .
[22] J. A. Buzacott,et al. Modelling manufacturing systems , 1984 .
[23] H. Rahnejat,et al. An Expert System Aproach to Discrete‐Change Simulation , 1988 .
[24] B. J. Davies,et al. A preliminary review of batch sizes in a job shop using a digital simulation model , 1983 .