A generalized timeline representation, services, and interface for automating space mission operations
暂无分享,去创建一个
Christoph Lenzen | Steve Chien | Mark D. Johnston | Steve Ankuo Chien | Nicola Policella | Jeremy Frank | Alicia Kavelaars | Mark Giuliano | J. Frank | C. Lenzen | M. Johnston | M. Giuliano | N. Policella | A. Kavelaars
[1] Mark D. Johnston,et al. Multi-objective scheduling for the Cluster II Constellation , 2011 .
[2] Rick Saylor,et al. Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission , 2009 .
[3] Laurence A. Kramer. Generating a Long Range Plan for a New Class of Astronomical Observatories , 2000 .
[4] Johanna M. Gunn,et al. TerraSAR-X/TanDEM-X Mission Planning: Handling Satellites in Close Formation , 2011 .
[5] Alex Fukunaga,et al. Iterative Repair Planning for Spacecraft Operations Using the Aspen System , 2000 .
[6] Alex Fukunaga,et al. Towards an application framework for automated planning and scheduling , 1997, 1997 IEEE Aerospace Conference.
[7] Amedeo Cesta,et al. MrSPOCK—STEPS IN DEVELOPING AN END‐TO‐END SPACE APPLICATION , 2011, Comput. Intell..
[8] Pau Klein,et al. San Francisco, California , 2007 .
[9] J. A. Tejo,et al. FlexPlan : An Operational Mission Planning & Scheduling COTS Used Internationally , 2006 .
[10] Michael McCurdy,et al. Scheduling and Planning Interface for Exploration ( SPIFe ) , 2011 .
[11] Mark D. Johnston,et al. Multi-Objective Multi-User Scheduling for Space Science Missions , 2010 .
[12] Theresa W. Beech,et al. Evolution of a Flexible Mission Planning and Scheduling System for Complex Missions : flexplan , 2009 .
[13] M. N. England,et al. The Evolution of the FUSE Spike Long Range Planning System , 2004 .
[14] Steve A. Chien,et al. Timeline-ased Space Operations Scheduling with External Constraints , 2010 .
[15] Frederic Py,et al. A deliberative architecture for AUV control , 2008, 2008 IEEE International Conference on Robotics and Automation.
[16] L. G. Gutierrez,et al. FlexPlan: Deployment of Powerful Comprehensive Mission Planning Systems , 2006 .
[17] Jeremy Frank,et al. Planning solar array operations on the international space station , 2011, TIST.
[18] Gonzalo Garcia,et al. Centralized Mission Planning and Scheduling System for the Landsat Data Continuity Mission (Landsat 8) , 2014 .
[19] Steve A. Chien,et al. Using Generic Preferences to Incrementally Improve Plan Quality , 2000, AIPS.
[20] Jeremy Frank,et al. Constraint-Based Attribute and Interval Planning , 2003, Constraints.
[21] J. Bresina,et al. Stable Grounded Inference in Flexible Resource Scheduling , 2011 .
[22] Paul Morris,et al. Planning Applications for Three Mars Missions with Ensemble , 2007 .
[23] Mark D. Johnston,et al. Developer Tools for Evaluating Multi-Objective Algorithms , 2011 .
[24] George Kosugi,et al. Observation scheduling tools for Subaru Telescope , 2004, SPIE Astronomical Telescopes + Instrumentation.
[25] Rob Sherwood,et al. Using Autonomy Flight Software to Improve Science Return on Earth Observing One , 2005, J. Aerosp. Comput. Inf. Commun..
[26] Steve Chien,et al. Extending the Representational Power of Model- Based Systems using Generalized Timelines , 2001 .
[27] Steve A. Chien,et al. Automating Planning and Scheduling of Shuttle Payload Operations , 1999, Artificial Intelligence.
[28] Jack Li,et al. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges , 2010 .
[29] Jay Kim,et al. Mission Planning and Scheduling for the Lunar Reconnaissance Orbiter , 2008 .
[30] Ari K. Jónsson,et al. Activity Planning for the Mars Exploration Rovers , 2005, ICAPS.
[31] Andrew Gerb,et al. Improving the observing efficiency of Hubble Space Telescope , 1993 .
[32] Benjamin D. Smith,et al. The RADARSAT-MAMM Automated Mission Planner , 2001, AI Mag..
[33] Mark D. Johnston,et al. Multi-Objective Evolutionary Algorithms for Scheduling the James Webb Space Telescope , 2008, ICAPS.
[34] Daniel Tran,et al. Automated and Adaptive Mission Planning for Orbital Express , 2008 .
[35] Gonzalo Garcia,et al. High-Impact Performance Processing Capabilities in Operational Mission Planning and Scheduling Systems , 2010 .
[36] Thomas Donaldson,et al. TransVERSE an Architecture for Configuring Astronomical Observations , 1998 .
[37] David J. Korsmeyer,et al. Utilization of Intelligent Systems Technologies for Manned Mission Operations Support , 2010 .
[38] M. Johnston,et al. S PIKE : Intelligent Scheduling of Hubble Space Telescope Observations , 1994 .
[39] Amedeo Cesta,et al. Developing an End-to-End Planning Application from a Timeline Representation Framework , 2009, IAAI.
[40] Mark E. Giuliano,et al. Towards a Heuristic for Scheduling the James Webb Space Telescope , 2007, ICAPS.
[41] Gary Curtis,et al. COSI: Adding Constraints to the object-oriented paradigm , 1999 .
[42] Rob Sherwood,et al. An autonomous Earth observing sensorweb , 2005, 2005 IEEE International Conference on Systems, Man and Cybernetics.
[43] Christoph Lenzen,et al. TerraSAR-X/TanDEM-X Mission Planning Handling Satellites in Close Formation , 2010 .
[44] Christoph Lenzen,et al. TerraSAR-X Mission Planning System: Automated Command Generation for Spacecraft Operations , 2010, IEEE Transactions on Geoscience and Remote Sensing.
[45] Paul Morris,et al. State-Based Scheduling via Active Resource Solving , 2011, 2011 IEEE Fourth International Conference on Space Mission Challenges for Information Technology.
[46] M. Johnston,et al. MUSE : THE MULTI-USER SCHEDULING ENVIRONMENT FOR MULTI-OBJECTIVE SCHEDULING OF SPACE SCIENCE MISSIONS , 2009 .
[47] Amedeo Cesta,et al. An Innovative Product for Space Mission Planning: An A Posteriori Evaluation , 2007, ICAPS.