A simulation based optimization approach to combine two hedging control policies in a transported degrading failure-prone manufacturing system
暂无分享,去创建一个
Sajjad Shokouhyar | Mohammadbagher Afshar-Bakeshloo | Saeed Abdolmaleki | Sajjad Shokouhyar | S. Abdolmaleki | M. Afshar-Bakeshloo
[1] M. Elhafsi,et al. Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution , 1996 .
[2] Kenneth Sörensen,et al. Production control in a failure-prone manufacturing network using discrete event simulation and automated response surface methodology , 2011 .
[3] H. Pham,et al. Invited reviewImperfect maintenance , 1996 .
[4] Ali Gharbi,et al. Production planning and repair/replacement switching policy for deteriorating manufacturing systems , 2011 .
[5] Sami Kara,et al. An Integrated Simulation Optimisation Decision Support Tool for Multi-Product Production Systems , 2017 .
[6] Shaomin Wu,et al. Doubly geometric processes and applications , 2018, J. Oper. Res. Soc..
[7] Ali Gharbi,et al. Environmental issue in an alternative production–maintenance control for unreliable manufacturing system subject to degradation , 2015 .
[8] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[9] Berend Denkena,et al. Condition based maintenance planning of highly productive machine tools , 2012, Prod. Eng..
[10] F. Jolai,et al. A green vehicle routing problem with customer satisfaction criteria , 2016 .
[11] Ali Gharbi,et al. Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems , 2011 .
[12] Ali Gharbi,et al. Production and preventive maintenance rates control for a manufacturing system: An experimental design approach , 2000 .
[13] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[14] Ali Gharbi,et al. Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems , 2003 .
[15] Ali Gharbi,et al. Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems , 2007 .
[16] Jean-Pierre Kenné,et al. Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups , 2006 .
[17] Fariborz Jolai,et al. Determining Maintenance Opportunity Window (MOW) in Job-Shop Systems by Considering Manpower of Maintenance , 2018 .
[18] Ali Gharbi,et al. Age-dependent production and replacement strategies in failure-prone manufacturing systems , 2017 .
[19] Ali Gharbi,et al. A simulation optimization approach in production planning of failure prone manufacturing systems , 2001, J. Intell. Manuf..
[20] Zied Hajej,et al. Joint Optimization Approach of Maintenance and Production Planning for a Multiple-Product Manufacturing System , 2015 .
[21] Fariborz Jolai,et al. A multi-objective Environmental Hedging Point Policy with customer satisfaction criteria , 2018 .
[22] Seifedine Kadry,et al. Simulation and analysis of staff scheduling in hospitality management , 2017, 2017 7th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO).
[23] Saeed Mansour,et al. Simulation-based optimisation of a sustainable recovery network for Waste from Electrical and Electronic Equipment (WEEE) , 2013, Int. J. Comput. Integr. Manuf..
[24] J. Quadrat. Numerical methods for stochastic control problems in continuous time , 1994 .
[25] Dirk Cattrysse,et al. Joint maintenance and inventory optimization systems: A review , 2013 .
[26] Kit-Nam Francis Leung. A note on ‘A bivariate optimal replacement policy for a repairable system’ , 2006 .
[27] Toshiro Tango,et al. AModified Block Replacement Policy Using LessReliable Items , 1979 .
[28] Ali Gharbi,et al. Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system , 2003 .
[29] Jack P. C. Kleijnen,et al. Optimization of simulated systems: OptQuest and alternatives , 2007, Simul. Model. Pract. Theory.