Research on HVDC transmission power scheduling on the background of asynchronous interconnection
暂无分享,去创建一个
Jizhong Zhu | Haoyong Chen | Jingpeng Chen | Xiaodong Zheng | Yiping Chen | Zipeng Liang | Yong Zhang | Julong Chen
[1] 丁茂生,et al. A New Mode of HVDC Tie-line Operation Optimization for Maximizing Renewable Energy Accommodation , 2015 .
[2] A. Lodi,et al. Solving Mixed-Integer Quadratic Programming problems with IBM-CPLEX : a progress report , 2014 .
[3] Narayana Prasad Padhy,et al. Unit commitment problem under deregulated environment-a review , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).
[4] Yong Fu,et al. A system of systems engineering approach for unit commitment in multi-area power markets , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.
[5] Chuntian Cheng,et al. Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head , 2012 .
[6] Peter Fairley,et al. Why Southern China broke up its power grid [News] , 2016 .
[7] Gerald B. Sheblé,et al. Unit commitment literature synopsis , 1994 .
[8] Stephen P. Boyd,et al. Convex Optimization , 2004, Algorithms and Theory of Computation Handbook.
[9] Hongbin Sun,et al. A look-ahead generation dispatch method considering discrete generation regulation constraints with large-scale wind power integration , 2014 .
[10] Moses Peter Musau,et al. Multi area multi objective dynamic economic dispatch with renewable energy and multi terminal DC tie lines , 2016, 2016 IEEE 6th International Conference on Power Systems (ICPS).
[11] Bin Wang,et al. Coordinated optimization of unit commitment and DC transmission power scheduling using benders decomposition , 2015, 2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT).