Analysis of cold leg LOCA with failed HPSI by means of integrated safety assessment methodology

Abstract The integrated safety assessment (ISA) methodology, developed by the Spanish Nuclear Safety Council (CSN), has been applied to a thermal–hydraulic analysis of cold leg LOCA sequences with unavailable High Pressure Injection System in a Westinghouse 3-loop PWR. This analysis has been performed with TRACE 5.0 patch 1 code. ISA methodology allows obtaining the Damage Domain (the region of space of parameters where a safety limit is exceeded) as a function of uncertain parameters (break area) and operator actuation times, and provides to the analyst useful information about the impact of these uncertain parameters in safety concerns. In this work two main issues have been analyzed: the effect of reactor coolant pump trip and the available time for beginning of secondary-side depressurization. The main conclusions are that present Emergency Operating Procedures (EOPs) are adequate for managing this kind of sequences and the ISA methodology is able to take into account time delays and parameter uncertainties.

[1]  W. J. Galyean,et al.  Rates of Initiating Events at U.S. Nuclear Power Plants , 1998 .

[2]  Pavel Kudinov,et al.  Development of methodology for identification of failure domains with GA-DPSA , 2012 .

[3]  Soon Heung Chang,et al.  A combined deterministic and probabilistic procedure for safety assessment of beyond design basis accidents in nuclear power plant: Application to ECCS performance assessment for design basis LOCA redefinition , 2013 .

[4]  Joseph R. Fragola,et al.  Human Reliability Analysis: A Systems Engineering Approach with Nuclear Power Plant Applications , 1988 .

[5]  César Queral,et al.  Application of Integrated Safety Assessment Methodology to SBO Sequences , 2013 .

[6]  M Kloos,et al.  Consideration of human actions in combination with the probabilistic dynamics method Monte Carlo dynamic event tree , 2008 .

[7]  Ümit V. Çatalyürek,et al.  Dynamic generation of accident progression event trees , 2008 .

[8]  César Queral,et al.  Analysis of the operator action and the single failure criteria in a SGTR sequence using best estimate assumptions with TRACE 5.0 , 2013 .

[9]  César Queral,et al.  Accident Management Actions in an Upper-Head Small-Break Loss-of-Coolant Accident with High-Pressure Safety Injection Failed , 2011 .

[10]  César Queral,et al.  Application of Integrated Safety Assessment Methodology to Feed and Bleed Sequences , 2013 .

[11]  Pavel Kudinov,et al.  Development and Application of a Genetic Algorithm Based Dynamic PRA Methodology to Plant Vulnerability Search , 2011 .

[12]  César Queral,et al.  Effects of delayed RCP trip during SBLOCA in PWR , 2014 .

[13]  César Queral,et al.  Accident Management Actions in a Lower Head SBLOCA With HPSI Failed , 2012 .

[14]  César Queral,et al.  SCAIS (Simulation Code System for Integrated Safety Assessment): Current status and applications , 2008 .

[15]  Joel A. Nachlas Reliability Engineering: Probabilistic Models and Maintenance Methods , 2005 .

[16]  Tunc Aldemir,et al.  A survey of dynamic methodologies for probabilistic safety assessment of nuclear power plants , 2013 .

[17]  M. Kloos,et al.  MCDET: A Probabilistic Dynamics Method Combining Monte Carlo Simulation with the Discrete Dynamic Event Tree Approach , 2006 .

[18]  César Queral,et al.  TRACE Model of Almaraz Nuclear Power Plant , 2005 .