A Problem in Single Facility Scheduling with Sequence Independent Changeover Costs
暂无分享,去创建一个
[1] Salah E. Elmaghraby,et al. The Scheduling of Lots on a Single Facility , 1970 .
[2] Hamdy A. Taha,et al. A Balasian-Based Algorithm for Zero-One Polynomial Programming , 1972 .
[3] H. Greenberg,et al. A Branch Search Algorithm for the Knapsack Problem , 1970 .
[4] Salah E. Elmaghraby,et al. THE SCHEDULING OF A MULTI-PRODUCT FACILITY , 1973 .
[5] P. Kolesar. A Branch and Bound Algorithm for the Knapsack Problem , 1967 .
[6] E. Balas. An Additive Algorithm for Solving Linear Programs with Zero-One Variables , 1965 .
[7] Henry L. W. Nuttle,et al. Scheduling Multi-Product Lots on a Single Facility. , 1971 .