An interactive multicriteria decision model for multipurpose reservoir management: the Shellmouth Reservoir

Reservoir management is inherently multicriterial, since any release decision involves implicit trade-offs between various conflicting objectives. The release decision reflects concerns such as flood protection, generation of hydroelectric power, dilution of wastewater and heated effluent, supply of municipal, agricultural and industrial water, maintenance of environmental standards and satisfaction of recreational needs. This paper presents a framework for analysing trade-offs between several decision criteria and includes the dilution of heated effluents from downstream thermoelectric power generation in an optimization model for reservoir management. The model is formulated and analysed in an interactive multicriteria decision-making (MCDM) modelling framework. Rather than providing specific target levels or ad hoc constants in a goal-programming framework as proposed elsewhere, this multicriteria framework suggests a systematic way of evaluating trade-offs by progressive preference assessment. The MCDM model, based on a Chebyshev metric and a contracted cone approach, is learning-oriented and permits a natural exploration of the decision space while maintaining non-dominated decisions. A detailed case study of the Shellmouth Reservoir in Manitoba, Canada serves as an illustration of the model.

[1]  Barbara J. Lence,et al.  Reservoir Management and Thermal Power Generation , 1992 .

[2]  D. H. Marks,et al.  Multiobjective screening models and water resource investment , 1973 .

[3]  Lucien Duckstein,et al.  Interactive multiobjective programing in water resources: A case study , 1973 .

[4]  Chaweng Changchit,et al.  A multiobjective reservoir operation model with stochastic inflows , 1993 .

[5]  Yujuin Yang Identification of an optimal operating policy for a multipurpose reservoir , 1991 .

[6]  Per Joakim Agrell,et al.  An MCDM framework for dynamic systems , 1996 .

[7]  William W.-G. Yeh,et al.  Reservoir Management and Operations Models: A State‐of‐the‐Art Review , 1985 .

[8]  Barbara J. Lence,et al.  Development of a framework for the selection of a reservoir operating policy , 1992 .

[9]  Jay E. Aronson,et al.  An interactive reservoir management system for Lake Kariba , 1998, Eur. J. Oper. Res..

[10]  David Kendrick,et al.  GAMS, a user's guide , 1988, SGNM.

[11]  Matthew J. Sobel,et al.  Chebyshev Optimal Waste Discharges , 1971, Oper. Res..

[12]  Slobodan P. Simonovic,et al.  Risk-based performance criteria for real-time reservoir operation , 1991 .

[13]  Lorraine R. Gardiner,et al.  Unified interactive multiple objective programming , 1994 .

[14]  Daniel P. Loucks,et al.  Reliability, resiliency, and vulnerability criteria for water resource system performance evaluation , 1982 .

[15]  Mark H. Houck,et al.  Real‐Time Reservoir Operations by Goal Programming , 1984 .

[16]  G. W. Evans,et al.  An Overview of Techniques for Solving Multiobjective Mathematical Programs , 1984 .

[17]  Aris P. Georgakakos Operational trade-offs in reservoir control , 1993 .

[18]  Ralph E. Steuer,et al.  Computational experience concerning payoff tables and minimum criterion values over the efficient set , 1988 .

[19]  Ralph E. Steuer,et al.  An interactive weighted Tchebycheff procedure for multiple objective programming , 1983, Math. Program..

[20]  R. Słowiński,et al.  Molp with an interactive assessment of a piecewise linear utility function , 1987 .

[21]  Donald H. Burn,et al.  RESERVOIR OPERATING POLICIES CONSIDERING RELEASE CHANGE , 1993 .

[22]  Marek Makowski,et al.  Multiple Criteria Analysis for Regional Water Quality Management: the Nitra River Case , 1995 .

[23]  Ian C. Goulter,et al.  Multi‐objective analysis of boating and fishlife interests in Lake Sommen, Sweden , 1988 .

[24]  James E. Giles,et al.  Weekly Multipurpose Planning Model for TVA Reservoir System , 1981 .

[25]  J. Cohon Multiobjective optimization in water resources systems , 1976 .

[26]  A. Wierzbicki On the completeness and constructiveness of parametric characterizations to vector optimization problems , 1986 .

[27]  H. G. Daellenbach,et al.  A comparative evaluation of interactive solution methods for multiple objective decision models , 1987 .

[28]  Bithin Datta,et al.  Short-Term, Single, Multiple-Purpose Reservoir Operation: Importance of Loss Functions and Forecast Errors , 1984 .

[29]  Samir El Magnouni,et al.  A multicriterion approach to groundwater management , 1994 .

[30]  Wan Seon Shin,et al.  Interactive multiple objective optimization: Survey I - continuous case , 1991, Comput. Oper. Res..

[31]  Y. Haimes,et al.  Multiobjectives in water resource systems analysis: The Surrogate Worth Trade Off Method , 1974 .

[32]  G. A. Miller THE PSYCHOLOGICAL REVIEW THE MAGICAL NUMBER SEVEN, PLUS OR MINUS TWO: SOME LIMITS ON OUR CAPACITY FOR PROCESSING INFORMATION 1 , 1956 .

[33]  Marek Makowski,et al.  A Prototype of a Decision Support System for River Basin Water Quality Management in Central and Eastern Europe , 1993 .

[34]  Ralph E. Steuer,et al.  A Heuristic for Estimating Nadir Criterion Values in Multiple Objective Linear Programming , 1997, Oper. Res..

[35]  Andrzej P. Wierzbicki,et al.  The Use of Reference Objectives in Multiobjective Optimization , 1979 .