Optimal preventive maintenance level for a repairable product under warranty subject to multimode failure process

[1]  S. G. Deshmukh,et al.  Integrated procurement-production systems: A review , 1992 .

[2]  Yigal Gerchak,et al.  Nash bargaining over allocations in inventory pooling contracts , 2008 .

[3]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[4]  Viliam Makis,et al.  Optimal preventive and opportunistic maintenance policy for a two-unit system , 2017 .

[5]  Dong Ho Park,et al.  Optimal post-warranty maintenance policy with repair time threshold for minimal repair , 2013, Reliab. Eng. Syst. Saf..

[6]  D. N. P. Murthy,et al.  Product warranty management. II : An integrated framework for study , 1992 .

[7]  Yves Balcer,et al.  Replacement Costs Under Warranty: Cost Moments and Time Variability , 1986, Oper. Res..

[8]  Alizar Hasan,et al.  Minimizing economic and environmental impacts through an optimal preventive replacement schedule: Model and application , 2017 .

[9]  Dong Ho Park,et al.  Optimal maintenance policies during the post-warranty period for second-hand item , 2003, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[10]  Shey-Huei Sheu,et al.  A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul , 2012, Int. J. Syst. Sci..

[11]  Vineet Padmanabhan,et al.  Warranties, extended warranties, and product quality , 1998 .

[12]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[13]  A. Hollis,et al.  EXTENDED WARRANTIES, ADVERSE SELECTION, AND AFTERMARKETS , 1999 .

[14]  Rodrigo Pascual,et al.  Optimal maintenance service contract negotiation with aging equipment , 2008, Eur. J. Oper. Res..

[15]  Seungjin Whang,et al.  Competing in Product and Service: A Product Life-Cycle Model , 1997 .

[16]  Nani Kurniati,et al.  Optimal Single Replacement Policy for Products with Free-Repair Warranty Under a Finite Planning Horizon , 2015 .

[17]  D. N. P. Murthy,et al.  An optimal repair cost limit policy for servicing warranty , 1988 .

[18]  Mohammad A. AlKazimi,et al.  Investigating new risk reduction and mitigation in the oil and gas industry , 2015 .

[19]  Che Soong Kim,et al.  WARRANTY AND PREVENTIVE MAINTENANCE , 2001 .

[20]  J Wang,et al.  Offshore safety case approach and formal safety assessment of ships. , 2002, Journal of safety research.

[21]  Y. Chien Optimal age for preventive replacement under a combined fully renewable free replacement with a pro-rata warranty , 2010 .

[22]  Qianmei Feng,et al.  Reliability modeling for dependent competing failure processes with changing degradation rate , 2014 .

[23]  D. N. Prabhakar Murthy,et al.  Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..

[24]  D. N. P. Murthy,et al.  Product warranty management -- I: A taxonomy for warranty policies , 1992 .

[25]  Dong Ho Park,et al.  Optimization of cost and downtime for replacement model following the expiration of warranty , 2008, Reliab. Eng. Syst. Saf..

[26]  D. N. Prabhakar Murthy,et al.  Product warranty logistics: Issues and challenges , 2004, Eur. J. Oper. Res..

[27]  Rui Peng,et al.  A preventive maintenance policy based on dependent two-stage deterioration and external shocks , 2017, Reliab. Eng. Syst. Saf..

[28]  Dragan Banjevic,et al.  Optimal inspection of a complex system subject to periodic and opportunistic inspections and preventive replacements , 2012, Eur. J. Oper. Res..

[29]  D. Murthy,et al.  New product warranty: A literature review , 2002 .

[30]  Wei Jiang,et al.  Optimal periodic replacement policy for a warranted product subject to multi modes failure process , 2019 .

[31]  Warren H. Hausman,et al.  Warranty Inventory Optimization for Hitachi Global Storage Technologies, Inc , 2007, Interfaces.

[32]  John W. Mamer,et al.  Discounted and Per Unit Costs of Product Warranty , 1987 .

[33]  Vineet Padmanabhan,et al.  Warranty Policy and Extended Service Contracts: Theory and an Application to Automobiles , 1993 .

[34]  Y.-H. Chien Determining optimal warranty periods from the seller's perspective and optimal out-of-warranty replacement age from the buyer's perspective , 2005, Int. J. Syst. Sci..

[35]  T. Nakagawa,et al.  Extended optimal replacement model with random minimal repair costs , 1995 .

[36]  Frede Blaabjerg,et al.  Study and Handling Methods of Power IGBT Module Failures in Power Electronic Converter Systems , 2015, IEEE Transactions on Power Electronics.

[37]  Wei Jiang,et al.  Product and After-Sales Maintenance Service Pricing Decisions in a Risk-Averse Supply Chain , 2020, Asia Pac. J. Oper. Res..

[38]  Xiaohang Yue,et al.  Production , Manufacturing and Logistics Demand forecast sharing in a dual-channel supply chain , 2006 .

[39]  Andrew Hale,et al.  Evaluating safety in the management of maintenance activities in the chemical process industry , 1998 .

[40]  B. Giri,et al.  Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain , 2017, Int. J. Prod. Res..

[41]  Stelios Psarakis,et al.  Multivariate statistical process control charts: an overview , 2007, Qual. Reliab. Eng. Int..

[42]  Winand Emons,et al.  On the limitation of warranty duration , 1989 .

[43]  D. N. P. Murthy,et al.  An Optimal Policy for Servicing Warranty , 1986 .

[44]  D. N. P. Murthy,et al.  Warranty cost analysis for second-hand products , 2000 .

[45]  Rui Peng,et al.  Optimal maintenance strategy for systems with two failure modes , 2019, Reliab. Eng. Syst. Saf..

[46]  Yeu-Shiang Huang,et al.  A Bayesian decision analysis in determining the optimal policy for pricing, production, and warranty of repairable products , 2008, Expert Syst. Appl..

[47]  Faisal Khan,et al.  Risk assessment of offshore crude oil pipeline failure , 2015 .

[48]  Ferenc Szidarovszky,et al.  Non-cooperative and cooperative game-theoretic models for usage-based lease contracts , 2016, Eur. J. Oper. Res..

[49]  Ming Zhou,et al.  Manufacturer's pricing strategy for supply chain with warranty period-dependent demand , 2012 .

[50]  Vineet Padmanabhan,et al.  USAGE HETEROGENEITY AND EXTENDED WARRANTIES , 1995 .

[51]  D. N. Prabhakar Murthy,et al.  Strategic warranty management: a life-cycle approach , 2000, IEEE Trans. Engineering Management.

[52]  D. N. Prabhakar Murthy,et al.  Warranty and discrete preventive maintenance , 2004, Reliab. Eng. Syst. Saf..

[53]  Mustapha Nourelfath,et al.  Integrated preventive maintenance and production decisions for imperfect processes , 2016, Reliab. Eng. Syst. Saf..

[54]  Ludo Gelders,et al.  EOQ type formulations for controlling repairable inventories , 1992 .