Optimal preventive maintenance level for a repairable product under warranty subject to multimode failure process
暂无分享,去创建一个
Azmat Ullah | Muhammad Ayat | Hakeem Ur Rehman | Lochan Kumar Batala | Muhammad Ayat | A. Ullah | H. Rehman
[1] S. G. Deshmukh,et al. Integrated procurement-production systems: A review , 1992 .
[2] Yigal Gerchak,et al. Nash bargaining over allocations in inventory pooling contracts , 2008 .
[3] R. Barlow,et al. Optimum Preventive Maintenance Policies , 1960 .
[4] Viliam Makis,et al. Optimal preventive and opportunistic maintenance policy for a two-unit system , 2017 .
[5] Dong Ho Park,et al. Optimal post-warranty maintenance policy with repair time threshold for minimal repair , 2013, Reliab. Eng. Syst. Saf..
[6] D. N. P. Murthy,et al. Product warranty management. II : An integrated framework for study , 1992 .
[7] Yves Balcer,et al. Replacement Costs Under Warranty: Cost Moments and Time Variability , 1986, Oper. Res..
[8] Alizar Hasan,et al. Minimizing economic and environmental impacts through an optimal preventive replacement schedule: Model and application , 2017 .
[9] Dong Ho Park,et al. Optimal maintenance policies during the post-warranty period for second-hand item , 2003, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.
[10] Shey-Huei Sheu,et al. A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul , 2012, Int. J. Syst. Sci..
[11] Vineet Padmanabhan,et al. Warranties, extended warranties, and product quality , 1998 .
[12] H. Pham,et al. Invited reviewImperfect maintenance , 1996 .
[13] A. Hollis,et al. EXTENDED WARRANTIES, ADVERSE SELECTION, AND AFTERMARKETS , 1999 .
[14] Rodrigo Pascual,et al. Optimal maintenance service contract negotiation with aging equipment , 2008, Eur. J. Oper. Res..
[15] Seungjin Whang,et al. Competing in Product and Service: A Product Life-Cycle Model , 1997 .
[16] Nani Kurniati,et al. Optimal Single Replacement Policy for Products with Free-Repair Warranty Under a Finite Planning Horizon , 2015 .
[17] D. N. P. Murthy,et al. An optimal repair cost limit policy for servicing warranty , 1988 .
[18] Mohammad A. AlKazimi,et al. Investigating new risk reduction and mitigation in the oil and gas industry , 2015 .
[19] Che Soong Kim,et al. WARRANTY AND PREVENTIVE MAINTENANCE , 2001 .
[20] J Wang,et al. Offshore safety case approach and formal safety assessment of ships. , 2002, Journal of safety research.
[21] Y. Chien. Optimal age for preventive replacement under a combined fully renewable free replacement with a pro-rata warranty , 2010 .
[22] Qianmei Feng,et al. Reliability modeling for dependent competing failure processes with changing degradation rate , 2014 .
[23] D. N. Prabhakar Murthy,et al. Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..
[24] D. N. P. Murthy,et al. Product warranty management -- I: A taxonomy for warranty policies , 1992 .
[25] Dong Ho Park,et al. Optimization of cost and downtime for replacement model following the expiration of warranty , 2008, Reliab. Eng. Syst. Saf..
[26] D. N. Prabhakar Murthy,et al. Product warranty logistics: Issues and challenges , 2004, Eur. J. Oper. Res..
[27] Rui Peng,et al. A preventive maintenance policy based on dependent two-stage deterioration and external shocks , 2017, Reliab. Eng. Syst. Saf..
[28] Dragan Banjevic,et al. Optimal inspection of a complex system subject to periodic and opportunistic inspections and preventive replacements , 2012, Eur. J. Oper. Res..
[29] D. Murthy,et al. New product warranty: A literature review , 2002 .
[30] Wei Jiang,et al. Optimal periodic replacement policy for a warranted product subject to multi modes failure process , 2019 .
[31] Warren H. Hausman,et al. Warranty Inventory Optimization for Hitachi Global Storage Technologies, Inc , 2007, Interfaces.
[32] John W. Mamer,et al. Discounted and Per Unit Costs of Product Warranty , 1987 .
[33] Vineet Padmanabhan,et al. Warranty Policy and Extended Service Contracts: Theory and an Application to Automobiles , 1993 .
[34] Y.-H. Chien. Determining optimal warranty periods from the seller's perspective and optimal out-of-warranty replacement age from the buyer's perspective , 2005, Int. J. Syst. Sci..
[35] T. Nakagawa,et al. Extended optimal replacement model with random minimal repair costs , 1995 .
[36] Frede Blaabjerg,et al. Study and Handling Methods of Power IGBT Module Failures in Power Electronic Converter Systems , 2015, IEEE Transactions on Power Electronics.
[37] Wei Jiang,et al. Product and After-Sales Maintenance Service Pricing Decisions in a Risk-Averse Supply Chain , 2020, Asia Pac. J. Oper. Res..
[38] Xiaohang Yue,et al. Production , Manufacturing and Logistics Demand forecast sharing in a dual-channel supply chain , 2006 .
[39] Andrew Hale,et al. Evaluating safety in the management of maintenance activities in the chemical process industry , 1998 .
[40] B. Giri,et al. Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain , 2017, Int. J. Prod. Res..
[41] Stelios Psarakis,et al. Multivariate statistical process control charts: an overview , 2007, Qual. Reliab. Eng. Int..
[42] Winand Emons,et al. On the limitation of warranty duration , 1989 .
[43] D. N. P. Murthy,et al. An Optimal Policy for Servicing Warranty , 1986 .
[44] D. N. P. Murthy,et al. Warranty cost analysis for second-hand products , 2000 .
[45] Rui Peng,et al. Optimal maintenance strategy for systems with two failure modes , 2019, Reliab. Eng. Syst. Saf..
[46] Yeu-Shiang Huang,et al. A Bayesian decision analysis in determining the optimal policy for pricing, production, and warranty of repairable products , 2008, Expert Syst. Appl..
[47] Faisal Khan,et al. Risk assessment of offshore crude oil pipeline failure , 2015 .
[48] Ferenc Szidarovszky,et al. Non-cooperative and cooperative game-theoretic models for usage-based lease contracts , 2016, Eur. J. Oper. Res..
[49] Ming Zhou,et al. Manufacturer's pricing strategy for supply chain with warranty period-dependent demand , 2012 .
[50] Vineet Padmanabhan,et al. USAGE HETEROGENEITY AND EXTENDED WARRANTIES , 1995 .
[51] D. N. Prabhakar Murthy,et al. Strategic warranty management: a life-cycle approach , 2000, IEEE Trans. Engineering Management.
[52] D. N. Prabhakar Murthy,et al. Warranty and discrete preventive maintenance , 2004, Reliab. Eng. Syst. Saf..
[53] Mustapha Nourelfath,et al. Integrated preventive maintenance and production decisions for imperfect processes , 2016, Reliab. Eng. Syst. Saf..
[54] Ludo Gelders,et al. EOQ type formulations for controlling repairable inventories , 1992 .