Development of an integrated system for planning earthwork operations in road construction

The objectives of existing computer programming methods of earthwork systems optimization in road construction have generally been either to minimize cost or maximize profit. However, the required computer memory needed is generally excessive and, moreover, the method demands a prior knowledge of the cost of transporting a unit of material along a given haul distance. As a consequence, the equipment resources would, by implication, have already been decided upon. Inexperienced personnel are clearly unable to reach this decision. This paper describes the development of an integrated system that combines earthwork allocation with the selection of equipment for road construction. Knowledge and experience possessed by planning engineers and equipment specialists has been captured and interpreted in a form suitable for manipulation by computer programs. The validity of the model is demonstrated by applying it to a real case study to provide an additional tool to management in deciding the earthwork allocation ...

[1]  Satish Mohan Expert systems applications in construction management and engineering , 1990 .

[2]  A. K. W. Jayawardane,et al.  Further development of integer programming in earthwork optimization , 1990 .

[3]  Frank C. Harris,et al.  A database/spreadsheet application for equipment selection , 1989 .

[4]  Said M. Easa,et al.  EARTHWORK ALLOCATIONS WITH NONCONSTANT UNIT COSTS , 1987 .

[5]  Colin S. Gray,et al.  A systematic approach to the selection of an appropriate crane for a construction site , 1985 .

[6]  Shrikant M. Nandgaonkar Earthwork Transportation Allocations: Operations Research , 1981 .

[7]  Sabah Alkass,et al.  EXPERT SYSTEM FOR EARTHMOVING EQUIPMENT SELECTION IN ROAD CONSTRUCTION , 1988 .

[8]  Robert M. Stark,et al.  Quantitative construction management: Uses of linear optimization , 1983 .

[9]  Sabah Toma Alkass,et al.  An expert system applied to earthmoving operations and equipment selection , 1988 .

[10]  Leonard E. Bernold,et al.  Low Level Artificial Intelligence and Computer Simulation to Plan and Control Earthmoving Operations , 1986 .

[11]  S. Easa Earthwork Allocations with Linear Unit Costs , 1988 .

[12]  James E. Diekmann,et al.  Claims Analysis and Computer Reasoning , 1984 .

[13]  Robert L. Peurifoy,et al.  Construction planning, equipment and methods , 1956 .

[14]  Thomas J. Siller,et al.  SURVEY OF THE STATE-OF-THE-ART EXPERT/KNOWLEDGE BASED SYSTEMS IN CIVIL ENGINEERING , 1986 .

[15]  Edward M. Mikhail,et al.  Introduction to surveying , 1984 .

[16]  Frederick Hayes-Roth,et al.  Building expert systems , 1983, Advanced book program.