Design of practical optimum JIT systems by integration of computer simulation and analysis of variance
暂无分享,去创建一个
[1] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[2] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[3] Richard J. Schonberger,et al. World Class Manufacturing Casebook: Implementing Jit and Tqc , 1987 .
[4] Hussein M. Reda. A review of “kanban”—the Japanese “Just-In-Time” production system , 1987 .
[5] Chaweng Changchit,et al. Effect of learning in Jit production system: a simulation experiment on a microcomputer , 1988 .
[6] Bhaba R. Sarker. Simulating a just-in-time production system , 1989 .
[7] Chaweng Changchit,et al. Simulation of a PCB assembly line: a modified JIT approach , 1989 .
[8] A. Alan B. Pritsker,et al. Slam II network models for decision support , 1989 .
[9] Claude Dennis Pegden,et al. A rule-based simulator for modeling Just-in-Time manufacturing systems (JITSAI) , 1990, Simul..
[10] Graham Sewell,et al. Management information systems for JIT production , 1990 .
[11] Sandra C. Parker,et al. Simulation analysis of just-in-time feasibility in a manufacturing environment , 1991 .
[12] Nesim Erkip,et al. Simulation analysis of a JIT production line , 1991 .
[13] J. E. Galletly,et al. JIT Manufacturing Simulation , 1991 .
[14] Pius J. Egbelu,et al. Design of a synchronous manufacturing system with just-in-time production (SMS/JITP) , 1991 .
[15] Mayank Chaturvedi,et al. Simulation modelling and analysis of a JIT production system , 1992 .
[16] Rick L. Wilson,et al. Describing processing time when simulating JIT environments , 1992 .
[17] Georges Abdul-Nour,et al. On some factors affecting the just-in-time production system output variability: a simulation study using Taguchi techniques , 1993 .
[18] G. Abdou,et al. A systematic simulation approach for the design of JIT manufacturing systems , 1993 .
[19] Felix T.S. Chan,et al. Simulation Aids JIT Assembly Line Manufacture: A Case Study , 1993 .
[20] Marc Gravel,et al. A review of optimisation models of Kanban-based production systems , 1994 .
[21] Christopher J. Cowton,et al. Making sense of just-in-time production: A resource-based perspective , 1994 .
[22] Reha Uzsoy,et al. Implementation of a demand-pull system in a job shop environment , 1994 .
[23] Gilles Cormier,et al. Conceptual design of a warehouse for just-in-time operations in a bakery , 1995 .
[24] Peter Race,et al. Spreadsheet simulation to aid capacity management of batch chemical processing using JIT pull control , 1995 .
[25] R. Burman. Manufacturing Management: Principles and Systems , 1995 .
[26] P. S. Welgama,et al. Use of simulation in the design of a JIT system , 1995 .
[27] Rhonda R. Lummus. A simulation analysis of sequencing alternatives for JIT lines using kanbans , 1995 .
[28] Mehmet Savsar,et al. Simulation analysis of just-in-time production systems , 1995 .
[29] Katsuhiko Takahashi,et al. Order Release in JIT Production Systems: A Simulation Study , 1996, Simul..
[30] Richard Lee Storch,et al. A non-sequential just-in-time simulation model , 1996 .
[31] Jimmie Browne,et al. Production Management Systems: An Integrated Perspective , 1996 .
[32] Armin Scholl,et al. ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .
[33] Mauro Caputo,et al. Just-in-time in ATO vehicle manufacturing: The Minivan-Piaggio V.E. case study , 1997 .
[34] Angappa Gunasekaran,et al. Implementation of just-in-time in a small company: A case study , 1997 .
[35] A. Alan B. Pritsker,et al. Simulation with Visual SLAM and AweSim , 1997 .
[36] Jeffrey K. Liker,et al. Becoming lean : inside stories of U.S. manufacturers , 1997 .
[37] Roger G. Schroeder,et al. The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .
[38] John Mackness,et al. Teaching the meaning of manufacturing synchronisation using simple simulation models , 1998 .
[39] Dingwei Wang,et al. A simulation and comparative study of the CONWIP, Kanban and MRP production control systems in a cold rolling plant , 1998 .
[40] Ömer Faruk Baykoç,et al. Simulation modelling and analysis of a JIT production system , 1998 .
[41] Sin-Hoon Hum,et al. JIT scheduling rules: a simulation evaluation , 1998 .
[42] Bhaba R. Sarker,et al. Optimum number of Kanbans between two adjacent stations , 1998 .
[43] Leonie Kohl,et al. Fundamental Concepts in the Design of Experiments , 2000 .
[44] Ali Azadeh,et al. Optimization of a Heavy Continuous Rolling Mill System Via Simulation , 2006 .