Construction engineering and project management II: an application of lean concepts and simulation for drainage operations maintenance crews
暂无分享,去创建一个
[1] R. Malcolm W. Horner,et al. Modeling Construction Labor Productivity , 1990 .
[2] Iris D. Tommelein,et al. More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .
[3] John Christian,et al. A computer-aided system to improve production rates in construction , 1996 .
[4] Ronie Navon. Process and quality control with a video camera, for a floor-tilling robot , 2000 .
[5] Yasser Abdel-Rady I. Mohamed,et al. USING SIMULATION FOR IMPROVING PRODUCTIVITY OF DRAINAGE OPERATIONS , 2002 .
[6] Daniel W. Halpin,et al. State of the art in construction simulation , 1992, WSC '92.
[7] Douglas D. Gransberg. A review of methods to estimate haul fleet production , 1998 .
[8] Iris D. Tommelein,et al. Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .
[9] Leonhard E. Bernold,et al. Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement , 1994 .
[10] Simaan M. AbouRizk,et al. Simphony-an integrated environment for construction simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[11] Simaan M. AbouRizk,et al. Application Framework for Development of Simulation Tools , 2000 .