A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al
暂无分享,去创建一个
[1] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[2] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[3] Erik Demeulemeester,et al. An integrated classification scheme for resource scheduling , 1999 .
[4] Ronald De Boer. Resource-constrained multi-project management, a hierarchical decision support system , 1998 .
[5] Pilar Tormos,et al. The Evolution of Software Quality in Project Scheduling , 1999 .
[6] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[7] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[8] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[9] Erik Demeulemeester,et al. A classification scheme for project scheduling , 1999 .
[10] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .
[11] K. Neumann,et al. GERT networks and the time-oriented evaluation of projects , 1979 .
[12] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[13] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .