ISO 9000 versus CMM: Standardization and certification of IS development

An absorbent disposable cover for hospital X-ray tables and the like. The cover has a bottom layer in the form of a sheet of plastic material that is impermeable to moisture, an intermediate fluid absorbent layer that functions as a blotter that will absorb and disperse any fluid it comes in contact with, and a top layer in the form of a sheet of material of semi-permeable material that will permit the flow of fluids into the intermediate fluid absorbent layer. A pre-formed corner pocket is formed at the respective corners of the cover and adhesive pads are attached to their bottom surface for detachably securing them to the corners of a table upon which the absorbent disposable cover has been placed. The covers are folded into a compact rectangular shape and stacked in a carton having a cutout slot in its top wall. The cover has been folded in such a manner that the pre-formed cover pockets are on top and located in the area of the cutout slots so they can be grasp for pulling the cover out of the dispensing slot.

[1]  G. John van der Pijl,et al.  Measuring the strategic dimensions of the quality of information , 1994, J. Strateg. Inf. Syst..

[2]  Terry Bollinger,et al.  A critical look at software capability evaluations , 1991, IEEE Software.

[3]  Bijan Fazlollahi,et al.  Selecting a requirement determination methodology-contingency approach revisited , 1991, Inf. Manag..

[4]  Christophe Debou,et al.  Decision making for software process improvement: A quantitative approach , 1994, J. Syst. Softw..

[5]  B. I. Blum,et al.  Characterizing the software process , 1994 .

[6]  Mark C. Paulk,et al.  How ISO 9001 Compares With The CMM , 1995, IEEE Softw..

[7]  Joseph Moses Juran Juran on planning for quality , 1988 .

[8]  Michiel van Genuchten,et al.  Software Quality in Consumer Electronics Products , 1996, IEEE Softw..

[9]  Watts S. Humphrey,et al.  Managing the software process , 1989, The SEI series in software engineering.

[10]  Douglas R. Vogel,et al.  Managing software quality in a very large development project , 1995, Inf. Manag..

[11]  David Rugg Using a capability evaluation to select a contractor , 1993, IEEE Software.

[12]  Mark C. Paulk,et al.  Key Practices of the Capability Maturity Model , 1991 .

[13]  Raymond Dion,et al.  Process improvement and the corporate balance sheet , 1993, IEEE Software.

[14]  Watts S. Humphrey,et al.  Characterizing the software process: a maturity framework , 1988, IEEE Software.

[15]  Barry W. Boehm,et al.  A spiral model of software development and enhancement , 1986, Computer.

[16]  Ross T. Hightower,et al.  Total Quality Management. Are information systems managers ready? , 1995, Inf. Manag..

[17]  Capers Jones,et al.  Programming Productivity , 1986 .

[18]  Mark C. Paulk,et al.  Capability Maturity Model for Software, Version 1.1 , 1993 .