Managing complex projects in the infrastructure sector — A structural equation model for flexibility-focused project management

Abstract Complex construction projects in the infrastructure sector are often beset with delays, which cause benefit shortfalls and increased costs. Prior project management literature and practice have mostly adopted a traditional control-focused approach, but recent research suggests that complex projects need more flexible practices to manage inevitable project change. Thus, the objectives of this study were to develop and empirically test a model for flexibility-focused project management practices to improve time performance in complex projects in the infrastructure sector. Based on empirical data from 138 construction projects procured and managed by the Swedish Transport Administration, the structural equation model shows that complexity and collaboration drive explorative learning, which improves adaptation and thereby improves time performance. Hence, the empirical test verifies that flexibility-focused project management practices based on collaboration, explorative learning, and adaptation enhance time performance in complex projects in the infrastructure sector.

[1]  Julien Pollack,et al.  The changing paradigms of project management , 2007 .

[2]  Harvey Maylor,et al.  Managerial Complexity in Project-Based Operations: A Grounded Model and Its Implications for Practice , 2008 .

[3]  Kalle Kähkönen,et al.  Role and nature of systemic innovations in construction and real estate sector , 2015 .

[4]  Henrik Szentes,et al.  Paradoxical Organizational Tensions between Control and Flexibility When Managing Large Infrastructure Projects , 2016 .

[5]  Albert P.C. Chan,et al.  From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis , 2015 .

[6]  Henrik Szentes,et al.  The Role of Co-Creation in Enhancing Explorative and Exploitative Learning in Project-Based Settings , 2017 .

[7]  A. Roth,et al.  The effect of an ambidextrous supply chain strategy on combinative competitive capabilities and business performance , 2010 .

[8]  S. Newell,et al.  Project-Based Learning and the Role of Learning Boundaries , 2004 .

[9]  James B. Schreiber,et al.  Reporting Structural Equation Modeling and Confirmatory Factor Analysis Results: A Review , 2006 .

[10]  Douglas D. Gransberg,et al.  Project Complexity Mapping in Five Dimensions for Complex Transportation Projects , 2013 .

[11]  Terry Williams,et al.  Assessing and moving on from the dominant project management discourse in the light of project overruns , 2005, IEEE Transactions on Engineering Management.

[12]  Jan B. Heide,et al.  The Shadow Of The Future: Effects Of Anticipated Interaction And Frequency Of Contact On Buyer-Seller Cooperation , 1992 .

[13]  Edward F. McDonough,et al.  Managing the Exploitation/Exploration Paradox: The Role of a Learning Capability and Innovation Ambidexterity , 2013 .

[14]  Jan Bröchner,et al.  Changes and change management in construction and IT projects , 2011 .

[15]  Sepani Senaratne,et al.  Engineering , Construction and Architectural Management Emerald Article : Role of knowledge in managing construction project change , 2012 .

[16]  Ludovic-Alexandre Vidal,et al.  Understanding project complexity: implications on project management , 2008, Kybernetes.

[17]  Aaron J. Shenhar,et al.  The Challenge of Innovation in Highly Complex Projects: What Can We Learn from Boeing's Dreamliner Experience? , 2016 .

[18]  Ossi Pesämaa,et al.  Personnel- and action control in gazelle companies in Sweden , 2017 .

[19]  James C. Anderson,et al.  STRUCTURAL EQUATION MODELING IN PRACTICE: A REVIEW AND RECOMMENDED TWO-STEP APPROACH , 1988 .

[20]  Anil Sawhney,et al.  Structural equation model for assessing impacts of contractor's performance on project success , 2011 .

[21]  Ludovic-Alexandre Vidal,et al.  Measuring project complexity using the Analytic Hierarchy Process , 2011 .

[22]  Seung Heon Han,et al.  Analyzing Schedule Delay of Mega Project: Lessons Learned From Korea Train Express , 2009, IEEE Transactions on Engineering Management.

[23]  Carl T. Haas,et al.  Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects , 2017 .

[24]  Mohan M. Kumaraswamy,et al.  Compressing construction durations: lessons learned from Hong Kong building projects , 2002 .

[25]  Christoph H. Loch,et al.  Lost Roots: How Project Management Came to Emphasize Control over Flexibility and Novelty , 2010 .

[26]  I. Nonaka A Dynamic Theory of Organizational Knowledge Creation , 1994 .

[27]  M. Hobday Product complexity, innovation and industrial organisation , 1998 .

[28]  Mendel Giezen,et al.  Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning , 2012 .

[29]  P. Bentler,et al.  Comparative fit indexes in structural models. , 1990, Psychological bulletin.

[30]  J. March Exploration and exploitation in organizational learning , 1991, STUDI ORGANIZZATIVI.

[31]  M. Hobday The Project-Based Organisation: An ideal form for managing complex products and systems? , 2000 .

[32]  Tom R. Burns,et al.  The Management of Innovation. , 1963 .

[33]  Jennifer Whyte,et al.  Managing change in the delivery of complex projects: Configuration management, asset information and 'big data' , 2016 .

[34]  C. William Ibbs Quantitative Impacts of Project Change: Size Issues , 1997 .

[35]  J. Scott Armstrong,et al.  Estimating nonresponse bias in mail surveys. , 1977 .

[36]  Rodney Turner,et al.  The Relationship between Project Success and Project Efficiency , 2015 .

[37]  Dan Lovallo,et al.  Delusion and Deception in Large Infrastructure Projects: Two Models for Explaining and Preventing Executive Disaster , 2009, 1303.7403.

[38]  Bo Xia,et al.  A critical review of structural equation modeling applications in construction research , 2015 .

[39]  Tina Karrbom Gustavsson,et al.  Rethinking dichotomization: A critical perspective on the use of “hard” and “soft” in project management research , 2014 .

[40]  Andrew William Brown,et al.  The relationship between human capital and time performance in project management: A path analysis , 2007 .

[41]  Karen Manley,et al.  Revisiting the adoption of innovative products on Australian road infrastructure projects , 2014 .

[42]  Barbara M. Byrne,et al.  Structural equation modeling with EQS : basic concepts, applications, and programming , 2000 .

[43]  Beliz Ozorhon,et al.  Investigating the Components of Innovation in Construction Projects , 2016 .

[44]  Lena E. Bygballe,et al.  Partnering relationships in construction: a literature review , 2010 .

[45]  Hazar Dib,et al.  Structural Equation Model of Building Information Modeling Maturity , 2016 .

[46]  Paul Nightingale,et al.  The product-process-organisation relationship in complex development projects , 2000 .

[47]  Stephen E. Humphrey,et al.  Group decision process and incrementalism in organizational decision making , 2003 .

[48]  Pankaj C. Patel,et al.  Managing Interorganizational Innovation Projects: Mitigating the Negative Effects of Equivocality Through Knowledge Search Strategies , 2016 .

[49]  Anna Kadefors,et al.  Procuring Service Innovations – Contractor Selection for Partnering Projects. , 2007 .

[50]  Thorbjørn Knudsen,et al.  Coordinated Exploration , 2014 .

[51]  Mike Bresnen Keeping it real? Constituting partnering through boundary objects , 2010 .

[52]  Martin Hemmert,et al.  Increasing Learning and Time Efficiency in Interorganizational New Product Development Teams , 2010 .

[53]  Ting-ya Hsieh,et al.  Statistical analysis of causes for design change in highway construction on Taiwan , 2005 .

[54]  Derek H.T. Walker,et al.  Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies , 2002 .

[55]  L. H. Alencar,et al.  Project procurement management: A structured literature review , 2017 .

[56]  B. Flyvbjerg What you Should Know about Megaprojects and Why: An Overview , 2014, 1409.0003.

[57]  Xianhai Meng,et al.  Taxonomy for change causes and effects in construction projects , 2009 .

[58]  Vincent Mangematin,et al.  The Two Faces of Knowledge Search: New Solutions and Capability Development , 2013 .

[59]  Per Erik Eriksson,et al.  Leadership in Civil Engineering: Effects of Project Managers’ Leadership Styles on Project Performance , 2015 .

[60]  Cindy L. Menches,et al.  Impact of pre‐construction planning and project characteristics on performance in the US electrical construction industry , 2008 .

[61]  Tom J. M. Mom,et al.  Investigating Managers' Exploration and Exploitation Activities: The Influence of Top-Down, Bottom-Up, and Horizontal Knowledge Inflows , 2006 .

[62]  B. Flyvbjerg,et al.  Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transport Infrastructure Projects , 2012, 1307.2179.

[63]  A. Tiwana Do bridging ties complement strong ties? An empirical examination of alliance ambidexterity , 2008 .

[64]  Richard P. Bagozzi,et al.  Specification, evaluation, and interpretation of structural equation models , 2012 .

[65]  Albert P.C. Chan,et al.  Measuring the complexity of mega construction projects in China—A fuzzy analytic network process analysis , 2015 .

[66]  Kim Wikström,et al.  Defining uncertainty in projects – a new perspective , 2008 .

[67]  Harvey Maylor,et al.  Now, let's make it really complex (complicated): A systematic review of the complexities of projects , 2011 .

[68]  Ossi Pesämaa,et al.  Network capability, innovativeness, and performance: a multidimensional extension for entrepreneurship , 2017 .

[69]  N. Gil,et al.  The innovation potential of new infrastructure development: An empirical study of Heathrow airport's T5 project , 2012 .

[70]  Wijnand Veeneman,et al.  Competing management approaches in large engineering projects: The Dutch RandstadRail project , 2011 .

[71]  Dov Dvir,et al.  Plans are nothing, changing plans is everything: the impact of changes on project success , 2004 .

[72]  Julien Pollack,et al.  Hard and soft projects: a framework for analysis , 2004 .

[73]  Joana Geraldi,et al.  Reconciling order and chaos in multi-project firms , 2008 .

[74]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[75]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[76]  Henrik Szentes,et al.  Managing the tensions between exploration and exploitation in large construction projects , 2017 .