Automated model progression scheduling using level of development
暂无分享,去创建一个
[1] Martin Hooper,et al. A BIM-Info delivery protocol , 2012 .
[2] Robin Drogemuller,et al. National Guidelines for Digital Modelling , 2009 .
[3] R. Yin. Case Study Research: Design and Methods , 1984 .
[4] Shutao Li,et al. Proposed Methodology for Generation of Building Information Model with Laserscanning , 2008 .
[5] Burcu Akinci,et al. Analysis of modeling effort and impact of different levels of detail in building information models , 2011 .
[6] Shen-Guan Shih,et al. BIM-based Computer-Aided Architectural Design , 2013 .
[7] Burcin Becerik-Gerber,et al. Building Information Modeling in Architecture, Engineering, and Construction: Emerging Research Directions and Trends , 2010 .
[8] Mustafa Al-Shammari. A critical appraisal of the Building Information Modelling (BIM) protocol that has been recently published by the Construction Industry Council (CIC) , 2013 .
[9] M. Brady. The Good Research Guide: For Small-Scale Social Research Projects Martyn Denscombe The Good Research Guide: For Small-Scale Social Research Projects Open University PressEdition: Third360£18.9903352202230335220223 , 2008 .
[10] M. Denscombe. The Good Research Guide: for small-scale social research projects , 1998 .
[11] Jae-Jun Kim,et al. A study on data interaction among different levels of detail in planning phases for mega projects , 2011 .