Offshore wind farm export cable current rating optimisation

The appropriate sizing of subsea export systems for offshore wind farms presents a number of challenges when striking an appropriate balance between design conservatism and cost effectiveness. Several areas of potential conservatism have been investigated through numerical modelling that has been backed by data that has been obtained from experimental 132kV 3-phase submarine cable.