Construction quality control of bunker slip form engineering
暂无分享,去创建一个
Combining with the slip form construction example of cylinder and attached arm of Majiayan coal mine bunker project engineering,the thesis seriously controls the construction quality of steel,embed members,bearing pile,concrete and formwork slip,concrete demoulding and maintenance and slip form construction accuracy and so on.As a result,it ensures the construction quality of the bunker slip form.