Performance measurement and management in practice : Advantages, disadvantages and reasons for use

Purpose - – Despite the fact that in recent years performance management and measurement (PMM) techniques and tools have attracted much research interest and that many scholars claim that implementing PMM yields many advantages, there is only a limited number of rigorous, systematic, scientific analysis of empirical studies into the benefits actually experienced by organizations in practice after introducing PMM. In addition little is known about specific reasons for organizations to start using PMM, and about the various relationships, if any, between the advantages, disadvantages and reasons for PMM use. This paper seeks to address these issues. Design/methodology/approach - – This article identifies the advantages, disadvantages and reasons for use of SPM which organizations have experienced in practice, based on an extensive literature research and interviews at 17 prominent Dutch organizations. Findings - – The study found four main advantages, two main disadvantages and two main reasons for use. Research limitations/implications - – The main limitation is that the number of participating organizations and interviewees could be higher. Practical implications - – The practical implication of this research is that implementing and using PMM yields specific benefits for an organization and that management now knows which advantages are to be expected. Originality/value - – This research shows that management needs to make the advantages of PMM explicit before the PMM implementation starts and keep stressing these advantages during and after implementation. This will heighten commitment of organizational members for PMM and increase a successful use of PMM.

[1]  Darrell Rigby,et al.  Management Tools and Techniques: A Survey , 2001 .

[2]  Stacey Cummings,et al.  Performance Management: Program Evaluation and Quality Assurance in Vocational Rehabilitation , 2011 .

[3]  Vinh Sum Chau,et al.  The relationship of strategic performance management to team strategy, company performance and organizational effectiveness , 2008 .

[4]  S. Williams,et al.  Is intellectual capital performance and disclosure practices related , 2001 .

[5]  A. Neely The evolution of performance measurement research: Developments in the last decade and a research agenda for the next , 2005 .

[6]  Daniel J. Mundfrom,et al.  Minimum Sample Size Recommendations for Conducting Factor Analyses , 2005 .

[7]  K. Sim,et al.  Balanced scorecard: a rising trend in strategic performance measurement , 2001 .

[8]  David J. Cooper,et al.  Performance Measures and the Rationalization of Organizations , 2003 .

[9]  Ellen J. Dumond Making Best Use of Performance Measures and Information , 1994 .

[10]  Karima Kourtit,et al.  Strategic Performance Management in Practice: Advantages, Disadvantages and Reasons for Use , 2008 .

[11]  Paolo Taticchi,et al.  Performance measurement and management: a literature review and a research agenda , 2010 .

[12]  B. Peters,et al.  Performance Measurement and Management , 2002 .

[13]  T. Pfeiffer,et al.  A Descriptive Analysis on the Implementation of Balanced Scorecards in German-Speaking Countries , 2003 .

[14]  Larry Hatcher,et al.  A Step-by-Step Approach to Using the SAS System for Factor Analysis and Structural Equation Modeling , 1994 .

[15]  Ja Jen Algera,et al.  Quality Improvement: Combining ProMES and SPC to Work Smarter , 1997 .

[16]  Juhani Ukko,et al.  Performance measurement impacts on management and leadership: Perspectives of management and employees , 2007 .

[17]  Derek Steeple,et al.  A FRAMEWORK FOR AUDITING AND ENHANCING PERFORMANCE MEASUREMENT SYSTEMS , 2000 .

[18]  Ramji Balakrishnan,et al.  New directions in management accounting research , 1997 .

[19]  Heinz Ahn,et al.  Applying the balanced scorecard concept : an experience report , 2001 .

[20]  Anne M. Lillis,et al.  The impact of manufacturing flexibility on management control system design , 1995 .

[21]  Jacky Holloway Performance management from multiple perspectives: taking stock , 2009 .

[22]  Dorothea Greiling,et al.  Performance measurement in the public sector: the German experience , 2005 .

[23]  Christopher H. Achen Interpreting and Using Regression , 1982 .

[24]  Jarmo Vakkuri,et al.  The impact of culture on the use of performance measurement information in the university setting , 2003 .

[25]  Roger J Pennell,et al.  The influence of communality andN on the sampling distributions of factor loadings , 1968 .

[26]  Marco Alberti,et al.  A framework to assess performance measurement systems in SMEs , 2010 .

[27]  A. E. Maxwell,et al.  Factor Analysis as a Statistical Method. , 1964 .

[28]  Fredrik Nilsson,et al.  Performance measurement at Nordic companies , 2000 .

[29]  K. Langfield-Smith,et al.  Multiple Perspectives of Performance Measures , 2007 .

[30]  Alan Fowler,et al.  Systems modelling, simulation, and the dynamics of strategy , 2003 .

[31]  J. Hair Multivariate data analysis , 1972 .

[32]  R. Banker A CONTEXTUAL STUDY OF LINKS BETWEEN EMPLOYEE SATISFACTION , EMPLOYEE TURNOVER , CUSTOMER SATISFACTION AND FINANCIAL PERFORMANCE , 2000 .

[33]  Pj Smoot Coming Up Short on Nonfinancial Performance Measurement , 2004 .

[34]  Maureen Meadows,et al.  The impact of performance measurement in strategic planning , 2005 .

[35]  Thomas L. Albright,et al.  An investigation of the effect of Balanced Scorecard implementation on financial performance , 2004 .

[36]  Umit Bititci,et al.  Emerging issues in performance measurement , 2014 .

[37]  Sylvain Delisle,et al.  An expert diagnosis system for the benchmarking of SMEs' performance , 2006 .

[38]  Andy Neely,et al.  Automating the balanced scorecard – selection criteria to identify appropriate software applications , 2003 .

[39]  A. Neely,et al.  The dynamics of value creation: mapping your intellectual performance drivers , 2004 .

[40]  P. Krugman Geography and Trade , 1992 .

[41]  Hale Kaynak,et al.  The relationship between total quality management: practices and their effects on firm performance , 2003 .

[42]  Didier P. Hostettler,et al.  The Balanced Scorecard: a Necessary Good or an Unnecessary Evil , 1999 .

[43]  Christopher D. Ittner,et al.  Subjectivity and the Weighting of Performance Measures: Evidence from a Balanced Scorecard , 2003 .

[44]  R. Dorf,et al.  The Balanced Scorecard: Translating Strategy Into Action , 1997, Proceedings of the IEEE.

[45]  A. Aquino,et al.  Causality in a Performance Measurement Model: A Case Study in a Brazilian Power Distribution Company , 2008 .

[46]  David F. Larcker,et al.  Total Quality Management and the Choice of Information and Reward Systems , 1995 .

[47]  Lorenzo Lucianetti,et al.  Contemporary Performance Measurement Systems: A Review of Their Consequences and a Framework for Research , 2012 .

[48]  Xianhai Meng,et al.  Performance measurement models in facility management: a comparative study , 2011 .

[49]  Robert H. Chenhall,et al.  Reliance on manufacturing performance measures, total quality management and organizational performance , 1997 .

[50]  Steven M. Hronec,et al.  Vital Signs: Using Quality, Time, and Cost Performance Measurements to Chart Your Company's Future , 1993 .

[51]  Suwit Srimai,et al.  Evolutionary paths of performance measurement: An overview of its recent development , 2011 .

[52]  W. A. Schiemann,et al.  Bullseye!: Hitting Your Strategic Targets Through High-Impact Measurement , 1999 .

[53]  Hanne Nørreklit The Balance on the Balanced Scorecard: A Critical Analysis of Some of Its Assumptions , 2000 .

[54]  Colin Robson,et al.  Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .

[55]  Peter Nijkamp,et al.  The Relationship between the Level of Completeness of a Strategic Performance Management System and Perceived Advantages and Disadvantages , 2009 .

[56]  C. Robson,et al.  Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .

[57]  André De Waal,et al.  Strategic Performance Management: A Managerial and Behavioral Approach , 2007 .

[58]  Julia Melkers,et al.  Models of Performance‐Measurement Use in Local Governments: Understanding Budgeting, Communication, and Lasting Effects , 2005 .

[59]  Andy Neely,et al.  Designing, implementing and updating performance measurement systems , 2000 .

[60]  Jacob Cohen Multiple regression as a general data-analytic system. , 1968 .

[61]  Jim Self Metrics and management: applying the results of the balanced scorecard , 2004 .

[62]  B. Tabachnick,et al.  Using Multivariate Statistics , 1983 .

[63]  Christopher D. Ittner,et al.  Does measuring intangibles for management purposes improve performance? A review of the evidence , 2008 .

[64]  Sai S. Nudurupati,et al.  The interplay between performance measurement, organizational culture and management styles , 2004 .

[65]  Peter C. Brewer,et al.  USING THE BALANCED SCORECARD TO MEASURE SUPPLY CHAIN PERFORMANCE. , 2000 .

[66]  George Ioannou,et al.  Implementing the Balanced Scorecard in Greece: a Software Firm's Experience , 2004 .

[67]  Alicia Santidrián,et al.  The usefulness of a performance measurement system in the daily life of an organisation: a note on a case study , 2003 .

[68]  Zahirul Hoque,et al.  TOTAL QUALITY MANAGEMENT AND THE BALANCED SCORECARD APPROACH: A CRITICAL ANALYSIS OF THEIR POTENTIAL RELATIONSHIPS AND DIRECTIONS FOR RESEARCH , 2003 .

[69]  E. A. Locke,et al.  Building a practically useful theory of goal setting and task motivation. A 35-year odyssey. , 2002, The American psychologist.

[70]  Louis Raymond,et al.  Researching performance measurement systems , 2008 .

[71]  J. Wilkes,et al.  Corporate performance management , 2003 .

[72]  A. Neely,et al.  WHY MEASUREMENT INITIATIVES FAIL , 2000 .

[73]  Mike Kennerley,et al.  Managing through measures: a study of impact on performance , 2005 .

[74]  M. Browne A comparison of factor analytic techniques , 1968, Psychometrika.

[75]  D. Larcker,et al.  Quality strategy, strategic control systems, and organizational performance , 1997 .

[76]  Mary A. Malina,et al.  Communicating and Controlling Strategy: An Empirical Study of the Effectiveness of the Balanced Scorecard , 2001 .

[77]  D. Jackson,et al.  A Comparison Of Component And Factor Patterns: A Monte Carlo Approach. , 1982, Multivariate behavioral research.

[78]  Edson Pinheiro de Lima,et al.  Strategic performance measurement systems: a discussion about their roles , 2009 .

[79]  Christopher Mausolff,et al.  Performance Measurement and Program Effectiveness: A Structural Equation Modeling Approach , 2008 .

[80]  Andy Neely,et al.  Getting the measure of your business , 2002 .

[81]  Angela Baron,et al.  Performance Management : The New Realities , 1998 .

[82]  Victoria Wass,et al.  Principles and Practice in Business and Management Research , 1994 .

[83]  A. D. Waal,et al.  The effect of performance management on the organizational results of a bank , 2007 .

[84]  S. Widener,et al.  Managing Value Creation within the Firm: An Examination of Multiple Performance Measures , 2004 .

[85]  Juhani Kalevi Ukko,et al.  Managing through measurement : A framework for successful operative level performance measurement , 2009 .

[86]  The Balanced Scorecard as a Communication Protocol for Managing Across Intra- Organizational Borders Track: Operations Strategy Abstract , 2001 .

[87]  Hassan R. HassabElnaby,et al.  An Empirical Investigation of the Performance Consequences of Nonfinancial Measures , 2003 .

[88]  Tony Beasley,et al.  The characteristics of performance management research , 2013 .

[89]  J. Holloway A critical research agenda for organizational performance measurement , 1999 .

[90]  Kelvin F. Cross,et al.  Measure Up!: Yardsticks for Continuous Improvement , 1991 .

[91]  A. Neely,et al.  DOES THE BALANCED SCORECARD WORK : AN EMPIRICAL INVESTIGATION Professor , 2008 .

[92]  James E. Rauch Geography and trade: Paul Krugman (MIT Press, Cambridge, MA, 1991) 85 pp., $15.95 , 1993 .

[93]  Tony Beasley,et al.  The Characteristics of Performance Management Research — Implications and Challenges , 2004 .

[94]  Toby Hatch,et al.  Achieving strategy with scorecarding , 2005 .

[95]  Ad Kleingeld,et al.  Multilevel design of performance measurement systems: enhancing strategic dialogue throughout the organization☆ , 1999 .

[96]  James R. Evans An exploratory study of performance measurement systems and relationships with performance results , 2004 .

[97]  E. Nijssen,et al.  Performance effects of using the Balanced Scorecard: a note on the Dutch experience , 2004 .

[98]  Sujatha Perera,et al.  Customer-focused manufacturing strategy and the use of operations-based non-financial performance measures: A research note , 1997 .