Static Versus Dynamic Control of Material Flow in In-Plant Milk Run System

This paper presents a framework using analytical equations and simulation to choose the best material flow control system based on inventory cost and starvation performance. The study concentrates on in-plant milk run system and compares between traditional material flow control systems such as push and traditional kanban; and a new and more dynamic system which is an electronic kanban. A new electronic kanban system, called adjusted electronic kanban (AEK) that can utilize RFID technology has been proposed to deal with milk run trains shortages to decrease starvation of assembly lines. Simulation results showed that push system is effective when the variability in material consumption is not so high. Moreover, regular kanban is effective if there is sufficient trains’ capacity, but electronic kanban gives lower inventory levels. In the case of severe trains’ capacity shortages, AEK was found to be the best alternative.

[1]  Jonathan F. Bard,et al.  A Review of: “Lean Logistics: The Nuts and Bolts of Delivering Materials and Goods” , 2005 .

[2]  Nils Boysen,et al.  Optimally loading tow trains for just-in-time supply of mixed-model assembly lines , 2012 .

[3]  Yavuz A. Bozer,et al.  Performance evaluation of small-batch container delivery systems used in lean manufacturing – Part 1: system stability and distribution of container starts , 2013 .

[4]  Maurizio Faccio,et al.  Kanban number optimisation in a supermarket warehouse feeding a mixed-model assembly system , 2013 .

[5]  J. Deuse,et al.  A Planning Approach for In-plant Milk Run Processes to Optimize Material Provision in Assembly Systems , 2012 .

[6]  Rosario Domingo,et al.  Materials flow improvement in a lean assembly line: a case study , 2007 .

[7]  Hans-Otto Günther,et al.  Part feeding at high-variant mixed-model assembly lines , 2012 .

[8]  Bernd Noche,et al.  Efficient material flow in mixed model assembly lines , 2013, SpringerPlus.

[9]  Nils Boysen,et al.  Jena Research Papers in Business and Economics Optimally Routing and Scheduling Tow Trains for JIT-Supply of Mixed-Model Assembly Lines , 2010 .

[10]  Yavuz A. Bozer,et al.  Performance evaluation of small-batch container delivery systems used in lean manufacturing – Part 2: number of Kanban and workstation starvation , 2013 .

[11]  Sule Itir Satoglu,et al.  Design of a just-in-time periodic material supply system for the assembly lines and an application in electronics industry , 2013 .

[12]  Rosario Domingo,et al.  Redesigning an assembly line through lean manufacturing tools , 2009 .

[13]  Maurizio Faccio,et al.  Design and simulation of assembly line feeding systems in the automotive sector using supermarket, kanbans and tow trains: a general framework , 2013 .

[14]  Maher M Mckenna,et al.  Effect of Melia azedarach (Sapindales: Meliaceae) fruit extracts on Citrus Leafminer Phyllocnistis citrella (Lepidoptera: Gracillariidae) , 2013, SpringerPlus.