Critical Review of Reliability Centred Maintenance (RCM) for Asset Management in Electric Power Distribution System

The purpose of maintenance is to extend equipment lifetime or at least the mean time to the next failure. Maintenance too incurs expenditures that result in very costly consequences when not performed or performed too little, and it may not even be economical to perform it too frequently. Therefore the two costs must be balanced. In the past, this balance had been estimated by extrapolating the experience obtained from existing systems and using the rule - of – thumb methods. Nowadays, the tempo of advanced and softiscated research in that direction has rendered such rule – of – thumb methods obsolete. The literature works describing the reliability centred maintenance methods for managing distribution assets have grown until the papers can now be numbered in thousands. This paper presents critical review of the various existing methods that have been developed by different reseachers and proposes a probabilistic model that will provide a quantitative connection between reliability and maintenance, a link missing in all the heuristic approaches.

[1]  J. J. Burke,et al.  A systematic and cost effective method to improve distribution system reliability , 1999, 1999 IEEE Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.99CH36364).

[2]  Goran Andersson,et al.  Reliability centered maintenance applied to electrical distribution systems , 1999, PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376).

[3]  A. U. Adoghe,et al.  A Probabilistic Modeling of Distribution Equipment Deterioration; An application to Transformer Insulation. , 2010 .

[4]  J. Moubray Reliability-centred maintenance , 1995 .

[5]  J. Endrenyi,et al.  A failure-repair model with minimal and major maintenance , 1993 .

[6]  A. U. Adoghe,et al.  A Markov model for estimating the remaining life of electrical insulation in distribution transformer , 2010 .

[7]  R. E. Brown,et al.  Budget constrained planning to optimize power system reliability , 2000 .

[8]  Marvin Rausand,et al.  Reliability Centred Maintenance , 2008 .

[9]  Suzanne L. Holcombe National Technical Information Service , 2008 .

[10]  J. Endrenyi,et al.  The Present Status of Maintenance Strategies and the Impact of Maintenance on Reliability , 2001, IEEE Power Engineering Review.

[11]  Lena Neij,et al.  Building Sustainable Energy Systems - Swedish Experience , 2001 .

[12]  L. Bertling,et al.  A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems , 2005, IEEE Transactions on Power Systems.

[13]  H Lee Willis,et al.  Power distribution planning reference book , 2000 .

[14]  A.A. Chowdhury,et al.  Value-based distribution system reliability planning , 1996, IAS '96. Conference Record of the 1996 IEEE Industry Applications Conference Thirty-First IAS Annual Meeting.

[15]  R.E. Brown,et al.  Failure rate modeling using equipment inspection data , 2004, IEEE Transactions on Power Systems.

[16]  R. Eriksson,et al.  SURVEY OF CAUSES OF FAILURES BASED ON STATISTICS AND PRACTICE FOR IMPROVEMENTS OF PREVENTIVE MAINTENANCE PLANS , 2002 .