Concerning the theory of workload control
暂无分享,去创建一个
[1] Hubert Missbauer,et al. Aggregate order release planning for time-varying demand , 2002 .
[2] Roberto Cigolini,et al. Order review and release strategies ina job shop environment: A review and a classification , 1997 .
[3] C. Yano,et al. The strategic use of capacity slack in the economic lot scheduling problem with random demand , 1994 .
[4] Paul M. Bobrowski. Implementing a loading heuristic in a discrete release job shop , 1989 .
[5] P. S. Park,et al. Load smoothing with feedback in a bottleneck job shop , 1995 .
[6] Satya S. Chakravorty,et al. A STUDY OF THE UTILIZATION OF CAPACITY CONSTRAINED RESOURCES IN DRUM‐BUFFER‐ROPE SYSTEMS* , 2009 .
[7] Warren W. Fisher,et al. Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .
[8] Gary L. Hogg,et al. Workload control in the semiconductor industry , 2002 .
[9] Lawrence D. Fredendall,et al. Protective capacity positioning: Impact on manufacturing cell performance , 2001, Eur. J. Oper. Res..
[10] P. M. Bobrowski,et al. Work release strategies in a dual resource constrained job shop , 1989 .
[11] Ihsan Sabuncuoglu,et al. Analysis of order review/release problems in production systems , 1999 .
[12] Satya S. Chakravorty,et al. An evaluation of the DBR control mechanism in a job shop environment , 2001 .
[13] Lawrence D. Fredendall,et al. Improving the product mix heuristic in the theory of constraints , 1997 .
[14] Michael H. Kutner. Applied Linear Statistical Models , 1974 .
[15] Don T. Phillips,et al. A comparison of order release strategies in production control systems , 1992 .
[16] Brian G. Kingsman,et al. The effect of workload control (WLC) on performance in make-to-order companies , 1998 .
[17] Lawrence M. Wein,et al. A broader view of the job-shop scheduling problem , 1992 .
[18] Arnold H. Buss,et al. SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS , 2009 .
[19] Byron J. Finch,et al. Theory of constraints and linear programming: a comparison , 1992 .
[20] Michael A. Zazanis,et al. Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..
[21] Martin Land,et al. Workload control concepts in job shops A critical assessment , 1995 .
[22] Timothy D. Fry,et al. Order review/release in the absence of adherence to formal scheduling policies , 1999 .
[23] Timothy D. Fry,et al. ORDER REVIEW/RELEASE AND LOT SPLITTING IN DRUM-BUFFER-ROPE , 1997 .
[24] Paul M. Bobrowski,et al. Job release and labor flexibility in a dual resource constrained job shop , 1989 .
[25] J. W. M Bertrand,et al. Workload based order release and productivity: a missing link , 2002 .
[26] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[27] J. J. Kanet. Load-limited order release in job shop scheduling systems , 1988 .
[28] Richard J. Penlesky,et al. Impact of product structure on order review/evaluation procedures , 2005, Ind. Manag. Data Syst..
[29] Kenneth R. Baker,et al. The effects of input control in a simple scheduling model , 1984 .
[30] Mauricio G. C. Resende,et al. A scheduling rule for job release in semiconductor fabrication , 1988 .
[31] Ihsan Sabuncuoglu,et al. A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops , 2000, Decis. Sci..
[32] Lawrence D. Fredendall,et al. Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .
[33] Mark Stevenson,et al. A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .
[34] Robert M. O'Keefe,et al. Order Release in Automated Manufacturing Systems , 1995 .
[35] R.-K. Li,et al. Integrating order release control with due-date assignment rules , 1997 .
[36] Linda Hendry,et al. Alternative order release mechanisms: a comparison by simulation , 1994 .
[37] Y. T. Herer,et al. CONWIP-based production lines with multiple bottlenecks: performance and design implications , 1999 .
[38] John B. Jensen,et al. Management of Vital Customer Priorities in Job Shop Manufacturing Environments , 1994 .
[39] Brian G. Kingsman,et al. The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies , 2002 .
[40] Peter Nyhuis,et al. The workload control concept: theory and practical extensions of Load Oriented Order Release , 2002 .
[41] Vincent A. Mabert,et al. AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .
[42] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[43] Martin Land,et al. Improving a practical DBR buffering approach using Workload Control , 2003 .
[44] Alberto Portioli,et al. An enhanced loading model for the probabilistic workload control under workload imbalance , 1996 .
[45] Vincent A. Mabert,et al. Alternate Routing Strategies in Batch Manufacturing: An Evaluation , 1988 .
[46] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .
[47] Bruno Baynat,et al. Determining inventory levels in a CONWIP controlled job shop , 2000 .
[48] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[49] Wallace J. Hopp,et al. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines , 1998 .
[50] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .
[51] Paul S. Park,et al. Workload smoothing in a bottleneck job shop , 1996 .
[52] Seung-Chul Kim,et al. EVALUATING ORDER RELEASE MECHANISMS IN A JOB SHOP WITH SEQUENCE‐DEPENDENT SETUP TIMES , 2009 .
[53] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[54] John B. Jensen,et al. An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .
[55] Lawrence D. Fredendall,et al. Information and scheduling in a dual resource constrained job shop , 1996 .
[56] A. Alan B. Pritsker,et al. Simulation with Visual SLAM and AweSim , 1997 .
[57] D. R. Denzler,et al. Evaluating variance control, order review/release and dispatching: a regression analysis , 1994 .
[58] G. Zäpfel,et al. New concepts for production planning and control , 1993 .