Concerning the theory of workload control

An existing taxonomy of workload control rules is adapted to classify 25 workload control rules and their components examined in prior research to create a basis to model how three workload control rule components - order selection, work aggregation and buffer limits - affect shop performance in environments that differ in their bottleneck utilization and protective capacity levels. Two of the most frequently studied rules in the literature - CONWIP and DBR - were included in the simulation. Data analysis found that the workload control rules had a significant positive effect on the shop performance measures only in environments with the highest bottleneck utilization and the lowest protective capacity. However, the work aggregation method was found to be an important component of the workload control rule. Suggestions were made for future research that could increase our understanding of workload control rules and integrate this research with our understanding of lean production.

[1]  Hubert Missbauer,et al.  Aggregate order release planning for time-varying demand , 2002 .

[2]  Roberto Cigolini,et al.  Order review and release strategies ina job shop environment: A review and a classification , 1997 .

[3]  C. Yano,et al.  The strategic use of capacity slack in the economic lot scheduling problem with random demand , 1994 .

[4]  Paul M. Bobrowski Implementing a loading heuristic in a discrete release job shop , 1989 .

[5]  P. S. Park,et al.  Load smoothing with feedback in a bottleneck job shop , 1995 .

[6]  Satya S. Chakravorty,et al.  A STUDY OF THE UTILIZATION OF CAPACITY CONSTRAINED RESOURCES IN DRUM‐BUFFER‐ROPE SYSTEMS* , 2009 .

[7]  Warren W. Fisher,et al.  Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .

[8]  Gary L. Hogg,et al.  Workload control in the semiconductor industry , 2002 .

[9]  Lawrence D. Fredendall,et al.  Protective capacity positioning: Impact on manufacturing cell performance , 2001, Eur. J. Oper. Res..

[10]  P. M. Bobrowski,et al.  Work release strategies in a dual resource constrained job shop , 1989 .

[11]  Ihsan Sabuncuoglu,et al.  Analysis of order review/release problems in production systems , 1999 .

[12]  Satya S. Chakravorty,et al.  An evaluation of the DBR control mechanism in a job shop environment , 2001 .

[13]  Lawrence D. Fredendall,et al.  Improving the product mix heuristic in the theory of constraints , 1997 .

[14]  Michael H. Kutner Applied Linear Statistical Models , 1974 .

[15]  Don T. Phillips,et al.  A comparison of order release strategies in production control systems , 1992 .

[16]  Brian G. Kingsman,et al.  The effect of workload control (WLC) on performance in make-to-order companies , 1998 .

[17]  Lawrence M. Wein,et al.  A broader view of the job-shop scheduling problem , 1992 .

[18]  Arnold H. Buss,et al.  SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS , 2009 .

[19]  Byron J. Finch,et al.  Theory of constraints and linear programming: a comparison , 1992 .

[20]  Michael A. Zazanis,et al.  Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..

[21]  Martin Land,et al.  Workload control concepts in job shops A critical assessment , 1995 .

[22]  Timothy D. Fry,et al.  Order review/release in the absence of adherence to formal scheduling policies , 1999 .

[23]  Timothy D. Fry,et al.  ORDER REVIEW/RELEASE AND LOT SPLITTING IN DRUM-BUFFER-ROPE , 1997 .

[24]  Paul M. Bobrowski,et al.  Job release and labor flexibility in a dual resource constrained job shop , 1989 .

[25]  J. W. M Bertrand,et al.  Workload based order release and productivity: a missing link , 2002 .

[26]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[27]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .

[28]  Richard J. Penlesky,et al.  Impact of product structure on order review/evaluation procedures , 2005, Ind. Manag. Data Syst..

[29]  Kenneth R. Baker,et al.  The effects of input control in a simple scheduling model , 1984 .

[30]  Mauricio G. C. Resende,et al.  A scheduling rule for job release in semiconductor fabrication , 1988 .

[31]  Ihsan Sabuncuoglu,et al.  A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops , 2000, Decis. Sci..

[32]  Lawrence D. Fredendall,et al.  Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .

[33]  Mark Stevenson,et al.  A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .

[34]  Robert M. O'Keefe,et al.  Order Release in Automated Manufacturing Systems , 1995 .

[35]  R.-K. Li,et al.  Integrating order release control with due-date assignment rules , 1997 .

[36]  Linda Hendry,et al.  Alternative order release mechanisms: a comparison by simulation , 1994 .

[37]  Y. T. Herer,et al.  CONWIP-based production lines with multiple bottlenecks: performance and design implications , 1999 .

[38]  John B. Jensen,et al.  Management of Vital Customer Priorities in Job Shop Manufacturing Environments , 1994 .

[39]  Brian G. Kingsman,et al.  The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies , 2002 .

[40]  Peter Nyhuis,et al.  The workload control concept: theory and practical extensions of Load Oriented Order Release , 2002 .

[41]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[42]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[43]  Martin Land,et al.  Improving a practical DBR buffering approach using Workload Control , 2003 .

[44]  Alberto Portioli,et al.  An enhanced loading model for the probabilistic workload control under workload imbalance , 1996 .

[45]  Vincent A. Mabert,et al.  Alternate Routing Strategies in Batch Manufacturing: An Evaluation , 1988 .

[46]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[47]  Bruno Baynat,et al.  Determining inventory levels in a CONWIP controlled job shop , 2000 .

[48]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[49]  Wallace J. Hopp,et al.  Setting WIP levels with statistical throughput control (STC) in CONWIP production lines , 1998 .

[50]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[51]  Paul S. Park,et al.  Workload smoothing in a bottleneck job shop , 1996 .

[52]  Seung-Chul Kim,et al.  EVALUATING ORDER RELEASE MECHANISMS IN A JOB SHOP WITH SEQUENCE‐DEPENDENT SETUP TIMES , 2009 .

[53]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[54]  John B. Jensen,et al.  An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .

[55]  Lawrence D. Fredendall,et al.  Information and scheduling in a dual resource constrained job shop , 1996 .

[56]  A. Alan B. Pritsker,et al.  Simulation with Visual SLAM and AweSim , 1997 .

[57]  D. R. Denzler,et al.  Evaluating variance control, order review/release and dispatching: a regression analysis , 1994 .

[58]  G. Zäpfel,et al.  New concepts for production planning and control , 1993 .