Mean-Variance Model for the Build-Operate-Transfer Scheme Under Demand Uncertainty

A mean-variance model was developed for determining the optimal toll and capacity in a build-operate-transfer (BOT) roadway project subject to traffic demand uncertainty. This mean-variance model involves two objectives: maximizing mean profit and minimizing the variance (or standard deviation) of profit. The variance associated with profit is considered as a risk. Because maximizing expected profit and minimizing risk are often conflicting, there may not be a single best solution that can simultaneously optimize both objectives. Hence, it is necessary to explicitly consider this as a multiobjective problem so that a set of nondominated solutions can be generated. In this study, the optimal toll and capacity selection for the BOT problem under demand uncertainty is formulated as a special case of the stochastic network design problem. A simulation-based multiobjective genetic algorithm was developed to solve this stochastic bilevel mathematical programming formulation. Numerical results are also presented as a case study.

[1]  Robert Harrison,et al.  An overview of highway privatization , 1994 .

[2]  J W Downer,et al.  TATE'S CAIRN TUNNEL, HONG KONG: SOUTH EAST ASIA'S LONGEST ROAD TUNNEL , 1992 .

[3]  Yafeng Yin,et al.  Genetic-Algorithms-Based Approach for Bilevel Programming Models , 2000 .

[4]  Anthony Chen,et al.  Assessing Financial Feasibility of a Build–Operate–Transfer Project Under Uncertain Demand , 2001 .

[5]  Hai Yang,et al.  PROFITABILITY AND WELFARE GAIN OF PRIVATE TOLL ROADS IN A NETWORK WITH HETEROGENEOUS USERS , 2002 .

[6]  Prianka N. Seneviratne,et al.  Transportation Infrastructure Financing: Evaluation of Alternatives , 1997 .

[7]  A. Osyczka,et al.  A new method to solve generalized multicriteria optimization problems using the simple genetic algorithm , 1995 .

[8]  Hai Yang,et al.  Competition and Equilibria of Private Toll Roads in a Traffic Network , 2000 .

[9]  Kenneth E. Case,et al.  Principles of Engineering Economic Analysis , 1977 .

[10]  Esther Malini,et al.  RISK ANALYSIS OF BOT APPROACHES FOR DEVELOPING TRANSPORT INFRASTRUCTURE , 1996 .

[11]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[12]  Richard J. Linn,et al.  Dynamic crane deployment in container storage yards , 2002 .

[13]  W. Lam,et al.  Risk Analysis of Traffic and Revenue Forecasts for Road Investment Projects , 1998 .

[14]  W. Sharpe,et al.  Mean-Variance Analysis in Portfolio Choice and Capital Markets , 1987 .

[15]  C S Fisk OPTIMAL SIGNAL CONTROLS ON CONGESTED NETWORKS , 1984 .

[16]  Hai Yang,et al.  HIGHWAY PRICING AND CAPACITY CHOICE IN A ROAD NETWORK UNDER A BUILD-OPERATE-TRANSFER SCHEME , 2000 .

[17]  A. J. Smith,et al.  Privatized infrastructure : the build operate transfer approach , 1995 .

[18]  D.-H. Lee,et al.  Path and link based traffic assignment algorithms: a comprehensive computational study , 2000 .