Grouping decomposition under constraints for design/build life cycle in project delivery system
暂无分享,去创建一个
[1] Pairote Sattayatham,et al. Weighted K-Means for Density-Biased Clustering , 2005, DaWaK.
[2] Masayuki Okamoto,et al. Color quantization using the fast K-means algorithm , 2000, Systems and Computers in Japan.
[3] John H. Relethford. Cluster analysis for researchers. By H.C. Romesburg. Belmont, CA: Lifetime Learning Publications. 1984. xiii + 334 pp., figures, tables, appendices, answers, glossary, references, index. $36.00 (cloth) , 1985 .
[4] Li Zheng,et al. Re-engineering of the design process for concurrent engineering , 2000 .
[5] Cliff Schexnayder,et al. Field-Level Management's Perspective of Design/Build , 1998 .
[6] Iris D. Tommelein,et al. DePlan: a tool for integrated design management , 2004 .
[7] T. Saaty,et al. Procedures for Synthesizing Ratio Judgements , 1983 .
[8] J. MacQueen. Some methods for classification and analysis of multivariate observations , 1967 .
[9] Keith R. Molenaar,et al. Educational Needs Assessment for Design/Build Project Delivery , 2003 .
[10] Donald E. Carter,et al. Ce Concurrent Engineering: The Product Development Environment for the 1990s , 1992 .
[11] Ibrahim M. Mahdi,et al. Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .
[12] Peter E.D. Love,et al. Concurrent engineering : a strategy for procuring construction projects , 1998 .
[13] Tyson R. Browning,et al. Use of Dependency Structure Matrices for Product Development Cycle Time Reduction , 1998 .
[14] Tzvi Raz,et al. Application of clustering techniques to information systems design , 1995, Inf. Softw. Technol..
[15] Keith R. Molenaar,et al. Selecting Design-Build: Public and Private Sector Owner Attitudes , 1996 .
[16] C. William Ibbs,et al. Project delivery systems and project change: Quantitative analysis , 2003 .
[17] Robert P. Smith,et al. A predictive model of sequential iteration in engineering design , 1997 .
[18] D.K.H. Chua,et al. Process-Parameter-Interface Model for Lean Design Management , 2001 .
[19] Carlos Ordonez,et al. Efficient disk-based K-means clustering for relational databases , 2004, IEEE Transactions on Knowledge and Data Engineering.
[20] Don-Lin Yang,et al. An Efficient k-Means Clustering Algorithm Using Simple Partitioning , 2005, J. Inf. Sci. Eng..
[21] Georgios P. Papamichail,et al. The k-means range algorithm for personalized data clustering in e-commerce , 2007, Eur. J. Oper. Res..
[22] Steven D. Eppinger,et al. Model-based Approaches to Managing Concurrent Engineering , 1991 .
[23] J. King. Machine-component grouping in production flow analysis: an approach using a rank order clustering algorithm , 1980 .
[24] Robert P. Smith,et al. A model-based method for organizing tasks in product development , 1994 .
[25] Christopher F. Earl,et al. An analysis of company structure and business processes in the capital goods industry in the UK , 2000, IEEE Trans. Engineering Management.
[26] Andrew N. Baldwin,et al. Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process , 2000 .
[27] Ujjwal Maulik,et al. Genetic clustering for automatic evolution of clusters and application to image classification , 2002, Pattern Recognit..
[28] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[29] Peter E.D. Love,et al. Procurement of construction facilities: a case study of design management within a design and construct organisation , 2004 .
[30] Tyson R. Browning,et al. Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.
[31] Dennis J. Sweeney,et al. Study guide to accompany an introduction to management science : quantitative approaches to decision making , 1985 .
[32] Pierre Hansen,et al. Fuzzy J-Means: a new heuristic for fuzzy clustering , 2001, Pattern Recognit..
[33] M. Chandrasekharan,et al. MODROC: an extension of rank order clustering for group technology , 1986 .
[34] Peter E.D. Love,et al. Concurrent engineering: a multi‐disciplinary approach for construction , 1998 .
[35] Andrew N. Baldwin,et al. A Data Flow Model to Plan and Manage the Building Design Process , 1996 .
[36] Michael R. Anderberg,et al. Cluster Analysis for Applications , 1973 .
[37] Glenn Ballard,et al. Cycle Time Reduction in Home Building , 2001 .
[38] D. V. Steward,et al. The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.