Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis

An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

[1]  Chen Huang,et al.  Final Project Report , 2001 .

[2]  U. Epa,et al.  Human Health Risk Assessment Protocol for Hazardous Waste Combustion Facilities , 1998 .

[3]  R. J. Buckland,et al.  INEL D&D long-range plan , 1995 .

[4]  Jeffrey Joseph McGuire Surveillance and Maintenance Plan for the 221-U Facility(U Plant) , 1999 .

[5]  B. W. Link,et al.  Decommissioning of the Ames Laboratory Research Reactor , 1982 .

[6]  A. E. Arave,et al.  Final report of the decontamination and decommissioning of the BORAX-V facility turbine building , 1992 .

[7]  E. Collins,et al.  Decontamination and decommissioning of the 60-inch Cyclotron facility at Argonne National Laboratory-East project final report , 2001 .

[8]  Susan M. Stacy Proving the Principle: A History of the Idaho National Engineering and Environmental Laboratory, 1949-1999 , 2000 .

[9]  C. L. Cheever,et al.  Decontamination of hot cells K-1, K-3, M-1, M-3, and A-1, M-Wing, Building 200: Project final report Argonne National Laboratory-East , 1996 .

[10]  R. J. Sexton,et al.  Decontamination and decommissioning of building 889 at Rocky Flats Environmental Technology Site , 1997 .

[11]  W. J. Price Department of Energy decontamination and decommissioning project experience , 1994 .

[12]  B. C. Lunis Removal of the Materials Test Reactor overhead working reservoir , 1975 .

[13]  S. A. Eide,et al.  Comprehensive WM/ER/D&D/LTS Risk Model For The INEEL , 2002 .

[14]  Steven James Piet,et al.  The KONVERGENCE Model for Sustainable Decisions , 2002 .

[15]  D. L. Smith,et al.  Decontamination and dismantlement of the old hot laundry, CFA-669. Final report , 1995 .

[16]  C. L. Cheever,et al.  Decontamination and decommissioning of 61 plutonium gloveboxes in D-Wing, Building 212 Argonne National Laboratory-East: Final project report , 1996 .

[17]  M. Salazar,et al.  Decommissioning the UHTREX Reactor Facility at Los Alamos, New Mexico , 1992 .

[18]  L. E. Boing,et al.  Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory , 1997 .

[19]  E W Abelquist,et al.  Decommissioning of a university research reactor. , 1994, Health physics.

[20]  G. M. Montoya,et al.  TA-2 Water Boiler Reactor Decommissioning Project , 1991 .

[21]  E. C. Wiese Decontamination and dismantlement of the building 594 waste ion exchange facility at Argonne National Laboratory-East project final report. , 1998 .

[22]  G. Garlock,et al.  Decontamination and decommissioning of the Argonne Thermal Source Reactor at Argonne National Laboratory - East project final report. , 1998 .

[23]  R. H. Smith,et al.  Dismantlement and decontamination of a plutonium-238 facility at the Savannah river site , 1994 .

[24]  Hine Decontamination and decommissioning of the Organic Moderated Reactor Experiment facility (OMRE) , 1980 .

[25]  Robert F. Potter,et al.  D&D OF HANFORD'S RETIRED PRODUCTION REACTORS: AN OPPORTUNITY TO DEMONSTRATE BEST COMMERCIAL PROCUREMENT PRACTICES , 2000 .

[26]  Steven James Piet,et al.  A Framework for Making Sustainable Cleanup Decisions Using the KONVERGENCE Model , 2002 .

[27]  Craig Stow,et al.  Statistics for Environmental Science and Management , 2002 .

[28]  C. R. Fellhauer,et al.  Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report , 1997 .

[29]  V. Rich Personal communication , 1989, Nature.

[30]  Hine Decontamination and Decommissioning of the SPERT-II and SPERT-III reactors at the Idaho National Engineering Laboratory , 1981 .

[31]  H. K. Elder Technology, Safety and Costs of Decommissioning Reference Nuclear Fuel Cycle and Non-Fuel Cycle Facilities Following Postulated Accidents , 1985 .

[32]  B. Bowerman,et al.  Decommissioning the Brookhaven National Laboratory Building 830 Gamma Irradiation Facility. , 2001 .