On-Ramp Metering and Commuter Delay: A Before and After Study

In this paper researchers report the cause and effect of time varying output flow through a 6.3-mile stretch of northbound Interstate 5 in Sacramento that contains a series of bottlenecks. The researchers found that variations in output flow were linked to the queue that forms and dissipates at a horizontal curve. This curve had become the site’s greatest bottleneck downstream. The researchers developed and field-tested a metering scheme upstream of the curve aimed at maximizing output from the horizontal curve. The researchers also confirmed that on-ramp metering can increase long-run average output flow and reduce system-wide delay. The paper includes a review of the literature, observations of traffic phenomenon at the site, and ramp metering field tests.

[1]  Jorge A. Laval,et al.  Hybrid models of traffic flow : impacts of bounded vehicle accelerations , 2004 .

[2]  Gordon F. Newell,et al.  Some Issues Relating to Metering or Closing of Freeway Ramps Part I. Control of a Single Ramp , 1976 .

[3]  R S Foote,et al.  EFFECT OF SHOCK WAVES ON TUNNEL TRAFFIC FLOW , 1960 .

[4]  Fred L. Hall,et al.  FREEWAY CAPACITY DROP AND THE DEFINITION OF CAPACITY , 1991 .

[5]  G. F. Newell A simplified theory of kinematic waves in highway traffic, part I: General theory , 1993 .

[6]  Kerner,et al.  Experimental properties of complexity in traffic flow. , 1996, Physical review. E, Statistical physics, plasmas, fluids, and related interdisciplinary topics.

[7]  Michael J. Cassidy,et al.  Relation between traffic density and capacity drop at three freeway bottlenecks , 2007 .

[8]  Robert L. Bertini,et al.  Part 2: Queuing and Lane-Changing Behavior: Empirical Analysis of Traffic Sensor Data Surrounding a Bottleneck on a German Autobahn , 2005 .

[9]  Michael J. Cassidy,et al.  Increasing Capacity of an Isolated Merge by Metering its On-Ramp , 2004 .

[10]  Carlos F. Daganzo,et al.  A BEHAVIORAL THEORY OF MULTI-LANE TRAFFIC FLOW. PART II, MERGES AND THE ONSET OF CONGESTION , 1999 .

[11]  Michael J. Cassidy,et al.  METHODOLOGY FOR ASSESSING DYNAMICS OF FREEWAY TRAFFIC FLOW , 1995 .

[12]  Carlos F. Daganzo,et al.  Fundamentals of Transportation and Traffic Operations , 1997 .

[13]  P. I. Richards Shock Waves on the Highway , 1956 .

[14]  Sam Yagar,et al.  Exploration of the Breakdown Phenomenon in Freeway Traffic , 1998 .

[15]  B. Eng Increasing freeway merge capacity through on-ramp metering , 2005 .

[16]  Markos Papageorgiou,et al.  Integrated Traffic-Responsive Urban Corridor Control Strategy in Glasgow, Scotland: Application and Evaluation , 2000 .

[17]  Markos Papageorgiou,et al.  ALINEA Local Ramp Metering: Summary of Field Results , 1997 .

[18]  M J Lighthill,et al.  ON KINEMATIC WAVES.. , 1955 .

[19]  B S Kerner THEORY OF CONGESTED TRAFFIC FLOW: SELF-ORGANIZATION WITHOUT BOTTLENECKS , 1999 .

[20]  D. S. Berry,et al.  PEAK-PERIOD CONTROL OF A FREEWAY SYSTEM-SOME THEORETICAL INVESTIGATIONS , 1965 .

[21]  James H Banks,et al.  TWO-CAPACITY PHENOMENON AT FREEWAY BOTTLENECKS: A BASIS FOR RAMP METERING? , 1991 .

[22]  Habib Haj-Salem,et al.  Ramp metering impact on urban corridor traffic: Field results , 1995 .

[23]  Gordon F. Newell,et al.  A SIMPLIFIED THEORY OF KINEMATIC WAVES , 1991 .

[24]  David John Lovell TRAFFIC CONTROL ON METERED NETWORKS WITHOUT ROUTE CHOICE , 1997 .

[25]  C. Daganzo,et al.  Possible explanations of phase transitions in highway traffic , 1999 .

[26]  Robert L. Bertini,et al.  Evaluating Benefits of Systemwide Adaptive Ramp-Metering Strategy in Portland, Oregon , 2007 .

[27]  Boris S. Kerner,et al.  Empirical Features of Congested Patterns at Highway Bottlenecks , 2002 .

[28]  B. Kerner Empirical macroscopic features of spatial-temporal traffic patterns at highway bottlenecks. , 2002, Physical review. E, Statistical, nonlinear, and soft matter physics.

[29]  Carlos F. Daganzo,et al.  Lane-changing in traffic streams , 2006 .

[30]  Carlos F. Daganzo,et al.  Smoothing Effect on Freeway Bottlenecks: Experimental Verification and Theoretical Implications , 2009 .

[31]  Gordon F. Newell,et al.  Some Issues Relating to Metering or Closing of Freeway Ramps Part II. Translationally Symmetric Corridor , 1976 .

[32]  Agr Bullen,et al.  MULTIPLE RAMP CONTROL FOR A FREEWAY BOTTLENECK , 1973 .

[33]  Kerner,et al.  Experimental features and characteristics of traffic jams. , 1996, Physical review. E, Statistical physics, plasmas, fluids, and related interdisciplinary topics.

[34]  Michael J. Cassidy Freeway On-Ramp Metering, Delay Savings, and Diverge Bottleneck , 2003 .

[35]  Leonard Newman,et al.  FREEWAY RAMP CONTROL--WHAT IT CAN AND CANNOT DO , 1969 .