Conceptual Model for Systematic Construction Waste Management
暂无分享,去创建一个
[1] Vivian W. Y Tam,et al. An investigation of construction wastes: an empirical study in Shenzhen , 2008 .
[2] Sugiharto Alwi,et al. Waste in the Indonesian Construction Projects , 2002 .
[3] A. B. Wahab,et al. An evaluation of waste control measures in construction industry in Nigeria , 2011 .
[4] Noor Zalina Mahmood. Approach in Construction Industry: A Case Study on Prefabrication Method As a Tool for Waste Minimisation. , 2008 .
[5] Leonhard E. Bernold,et al. Source evaluation of solid waste in building construction , 1994 .
[6] Nilay Cosgun,et al. A study conducted to reduce construction waste generation in Turkey , 2007 .
[7] Sugiharto Alwi,et al. Non Value-Adding Activities in Australian Construction Projects , 2002 .
[8] M Osmani,et al. Architects' perspectives on construction waste reduction by design. , 2008, Waste management.
[9] Mohan M. Kumaraswamy,et al. Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects , 2009 .
[10] Gul Polat,et al. Waste in Turkish Construction: Need for Lean Construction Techniques , 2004 .
[11] Clifford R. Robinson,et al. Reduce, reuse, and recycle , 2002, Nature Biotechnology.
[12] S. Piyaphant,et al. Environmental impact on municipal solid waste management system in Chaiyaphum , 2011 .
[13] Hongping Yuan,et al. Trend of the research on construction and demolition waste management. , 2011, Waste management.
[14] J. Badler,et al. Divergence between oculomotor and perceptual causality. , 2012, Journal of vision.
[15] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[16] Rawshan Ara Begum,et al. Waste Generation and Recycling: Comparison of Conventional and Industrialized Building Systems , 2010 .
[17] Zaini Sakawi,et al. MUNICIPAL SOLID WASTE MANAGEMENT IN MALAYSIA: SOLUTION FOR SUSTAINABLE WASTE MANAGEMENT , 2011 .
[18] David K. H. Chua,et al. RELATIONSHIP BETWEEN PRODUCTIVITY AND WASTES: A NEURAL NETWORK MODEL , 2003 .
[19] Ta Wee Seow. Senario pengurusan sisa pepejal di Malaysia , 2016 .
[20] Weisheng Lu,et al. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.
[21] Sepani Senaratne,et al. Lean construction as a strategic option : testing its suitability and acceptibility in Sri Lanka , 2008 .
[22] Mohd Armi Abu Samah,et al. Municipal solid waste management in Malaysia: practices and challenges. , 2009, Waste management.
[23] Nestor Matthews,et al. Right hemifield deficits in judging simultaneity: a perceptual learning study. , 2012, Journal of vision.
[24] Hongping Yuan. Key indicators for assessing the effectiveness of waste management in construction projects , 2013 .
[25] Sri Devi Ravana,et al. E-construction waste exchange in Malaysia: A preliminary study , 2008, 2008 International Symposium on Information Technology.
[26] Jian Zuo,et al. Improving waste management in construction projects: An Australian study , 2015 .
[27] P. Graham,et al. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation , 2000 .
[28] Bambang Trigunarsyah,et al. Identification of construction waste in road & highway construction projects , 2008 .
[29] George Ofori,et al. CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .