A proposed multi-objective optimization model for sequence-dependent disassembly line balancing problem

The government and public growing concern for waste is how to manage the returned products to realize the resource recycling and reuse. Product recovery operations are utilized to retrieve the desired parts and subassemblies out of the used products. It is important to design and balance disassembly line to optimize the product recovery process. Considering the disassembly precedence relationships and sequence-dependent parts removal time increments, this paper presents a multi-objective sequence-dependent disassembly line balancing problem (SDDLBP) optimization model, taking the number of opened workstations, total disassembly time, idle times of opened workstations, the hazardous components and high-demand parts altogether. The performance of the proposed model is evaluated by benchmark instances, and the computational results indicate the rationality and validity of the proposed model for solving multi-objective SDDLBP.

[1]  Rajeev Jain,et al.  A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment , 2014, Appl. Soft Comput..

[2]  Surendra M. Gupta,et al.  Ant colony optimization for sequence‐dependent disassembly line balancing problem , 2013 .

[3]  Surendra M. Gupta,et al.  A tabu search algorithm for balancing a sequence-dependent disassembly line , 2014 .

[4]  Surendra M. Gupta,et al.  Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm , 2015 .

[5]  Dervis Karaboga,et al.  A comparative study of Artificial Bee Colony algorithm , 2009, Appl. Math. Comput..

[6]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[7]  Jerry Y. H. Fuh,et al.  A multi-objective disassembly planning approach with ant colony optimization algorithm , 2008 .

[8]  Can Akkan,et al.  Task-failure-driven rebalancing of disassembly lines , 2012 .

[9]  Surendra M. Gupta,et al.  Disassembly line balancing. , 2007 .

[10]  Surendra M. Gupta,et al.  A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem , 2013, The International Journal of Advanced Manufacturing Technology.

[11]  Dervis Karaboga,et al.  AN IDEA BASED ON HONEY BEE SWARM FOR NUMERICAL OPTIMIZATION , 2005 .

[12]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[13]  Abe Zeid,et al.  Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning , 2014, J. Intell. Manuf..

[14]  Surendra M. Gupta,et al.  A variable neighbourhood search algorithm for disassembly lines , 2015 .

[15]  Ayyuce Aydemir-Karadag,et al.  Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..

[16]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[17]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[18]  Surendra M. Gupta,et al.  Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem , 2013, Expert Syst. Appl..

[19]  Surendra M. Gupta,et al.  Disassembly line in product recovery , 2002 .

[20]  Surendra M. Gupta,et al.  Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .

[21]  Surendra M. Gupta,et al.  Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem , 2013, MIM.

[22]  Turan Paksoy,et al.  Reverse supply chain optimisation with disassembly line balancing , 2013 .

[23]  Ihsan Sabuncuoglu,et al.  Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .

[24]  Surendra M. Gupta,et al.  A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem , 2016, Ann. Oper. Res..

[25]  Yixiong Feng,et al.  A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .