On the Analysis of Two New Models for Transporting Hazardous Materials

This paper considers two new decision-making problems in the context of transporting hazardous materials (HM). These problems are motivated by the fact that many practical situations only have a finite number of shipments of HM to be made and that shipments are likely to be suspended after a threshold number of accidents. Both problems are nonlinear, constrained shortest path problems. Exact solution methods are proposed and computational results are reported for the case where the threshold number of accidents is one. Extension of the methodology for higher values of the threshold number of accidents is also outlined.

[1]  M Abkowitz,et al.  Developing a risk/cost framework for routing truck movements of hazardous materials. , 1988, Accident; analysis and prevention.

[2]  Susan G. Hadden,et al.  Public Perception of Hazardous Waste1 , 1991 .

[3]  Ortwin Renn,et al.  Social Amplification of Risk An Empirical Study , 1990 .

[4]  P. Slovic Perception of risk. , 1987, Science.

[5]  E J Barber,et al.  GUIDELINES FOR APPLYING CRITERIA TO DESIGNATE ROUTES FOR TRANSPORTING HAZARDOUS MATERIALS. IMPLEMENTATION PACKAGE , 1980 .

[6]  Rajan Batta,et al.  A network-based model for transporting extremely hazardous materials , 1993, Oper. Res. Lett..

[7]  Mark A. Turnquist,et al.  Modeling and Analysis for Hazardous Materials Transportation: Risk Analysis, Routing/Scheduling and Facility Location , 1991, Transp. Sci..

[8]  Sheldon M. Ross,et al.  Stochastic Processes , 2018, Gauge Integral Structures for Stochastic Calculus and Quantum Electrodynamics.

[9]  Mark H. Karwan,et al.  The equity constrained shortest path problem , 1990, Comput. Oper. Res..

[10]  J V Mitchell,et al.  Perception of risk and credibility at toxic sites. , 1992, Risk analysis : an official publication of the Society for Risk Analysis.

[11]  Mark H. Karwan,et al.  Modeling Equity of Risk in the Transportation of Hazardous Materials , 1990, Oper. Res..

[12]  Edsger W. Dijkstra,et al.  A note on two problems in connexion with graphs , 1959, Numerische Mathematik.

[13]  J. Y. Yen Finding the K Shortest Loopless Paths in a Network , 1971 .

[14]  P Slovic,et al.  Perceived risk, stigma, and potential economic impacts of a high-level nuclear waste repository in Nevada. , 1991, Risk analysis : an official publication of the Society for Risk Analysis.