Optimizing integrated airport surface and terminal airspace operations under uncertainty
暂无分享,去创建一个
[1] Xian Zhou,et al. Stochastic scheduling to minimize expected maximum lateness , 2008, Eur. J. Oper. Res..
[2] Shangyao Yan,et al. Optimization of multiple objective gate assignments , 2001 .
[3] Ezequiel A. Di Paolo,et al. Binary-Representation-Based Genetic Algorithm for Aircraft Arrival Sequencing and Scheduling , 2008, IEEE Transactions on Intelligent Transportation Systems.
[4] Hamsa Balakrishnan,et al. A Framework for Coordinated Surface Operations Planning at Dallas-Fort Worth International Airport , 2007 .
[5] Ioane Muni Toke,et al. Parallel Iterative Linear Solvers on GPU: A Financial Engineering Case , 2010, 2010 18th Euromicro Conference on Parallel, Distributed and Network-based Processing.
[6] Lucio Bianco,et al. Scheduling Models and Algorithms for TMA Traffic Management , 1997 .
[7] Wooseung Jang,et al. Dynamic scheduling of stochastic jobs on a single machine , 2002, Eur. J. Oper. Res..
[8] Henry Y. K. Lau,et al. Integrated Optimization of Airport Taxiway and Runway Scheduling , 2014 .
[9] Amedeo R. Odoni,et al. A Stochastic Integer Program with Dual Network Structure and Its Application to the Ground-Holding Problem , 2003, Oper. Res..
[10] Hanif D. Sherali,et al. Enhanced Models for a Mixed Arrival-Departure Aircraft Sequencing Problem , 2014, INFORMS J. Comput..
[11] Regina R. Clewlow,et al. Impact of Arrivals on Departure Taxi Operations at Airports , 2010 .
[12] Heming Chen,et al. Multiple-Point Integrated Scheduling of Terminal Area Traffic , 2011 .
[13] Min Xue,et al. Optimizing integrated terminal airspace operations under uncertainty , 2014, 2014 IEEE/AIAA 33rd Digital Avionics Systems Conference (DASC).
[14] Sheik Meeran,et al. Deterministic job-shop scheduling: Past, present and future , 1999, Eur. J. Oper. Res..
[15] Alexander Shapiro,et al. On the Rate of Convergence of Optimal Solutions of Monte Carlo Approximations of Stochastic Programs , 2000, SIAM J. Optim..
[16] Arthur Richards,et al. Optimization of Taxiway Routing and Runway Scheduling , 2008, IEEE Transactions on Intelligent Transportation Systems.
[17] Min Xue,et al. GPU-based Parallelization for Schedule Optimization with Uncertainty , 2014 .
[18] Nick Johnson,et al. Super Density Operations Airspace Modeling for the Southern California Metroplex , 2011 .
[19] Antonio Sassano,et al. A Combinatorial Optimization Approach to Aircraft Sequencing Problem , 1987 .
[20] Michael Kupfer. Scheduling Aircraft Landings to Closely Spaced Parallel Runways , 2009 .
[21] B. Chandran,et al. A Dynamic Programming Algorithm for Robust Runway Scheduling , 2007, 2007 American Control Conference.
[22] Edmund K. Burke,et al. A Metaheuristic Approach to Aircraft Departure Scheduling at London Heathrow Airport , 2008 .
[23] Yoon C. Jung,et al. Managing departure aircraft release for efficient airport surface operations , 2010 .
[24] S. Rathinam,et al. AN OPTIMIZATION MODEL FOR REDUCING AIRCRAFT TAXI TIMES AT THE DALLAS FORT WORTH INTERNATIONAL AIRPORT , 2008 .
[25] John-Paul Clarke,et al. Runway Operations Optimization in the Presence of Uncertainties , 2010 .
[26] Gustaf Solveling. Stochastic programming methods for scheduling of airport runway operations under uncertainty , 2012 .
[27] Brian Capozzi,et al. A Hybrid Optimization Approach to Air Traffic Management for Metroplex Operations , 2010 .
[28] Seongim Choi,et al. Towards Optimal Routing and Scheduling of Metroplex Operations , 2009 .
[29] M. Simons. A functional analysis of integrated arrival, departure, and surface operations in NextGen , 2012, 2012 IEEE/AIAA 31st Digital Avionics Systems Conference (DASC).
[30] Harilaos N. Psaraftis,et al. A Dynamic Programming Approach for Sequencing Groups of Identical Jobs , 1980, Oper. Res..
[31] P. R. Waal,et al. An Optimisation Model for Airport Taxi Scheduling , 2004 .
[32] Cerry M. Klein,et al. Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models , 2005, Comput. Ind. Eng..
[33] Chandrasekar Sureshkumar. Throughput analysis for the National Airspace System , 2012 .
[34] Gillian Clare,et al. Air traffic flow management under uncertainty: application of chance constraints , 2012, ATACCS.
[35] Hanbong Lee,et al. A comparison of two optimization approaches for airport taxiway and runway scheduling , 2012, 2012 IEEE/AIAA 31st Digital Avionics Systems Conference (DASC).
[36] Yosef S. Sherif,et al. AN ALGORITHM FOR COMPUTER ASSISTED SEQUENCING AND SCHEDULING OF TERMINAL AREA OPERATIONS , 1991 .
[37] Jane Thipphavong,et al. Design Considerations for a New Terminal Area Arrival Scheduler , 2010 .
[38] Dimitris Bertsimas,et al. Multistage Air Traffic Flow Management under Capacity Uncertainty: A Robust and Adaptive Optimization Approach , 2011 .
[39] Nicolas Durand,et al. Airport surface management and runways scheduling , 2009 .
[40] David Abramson,et al. Scheduling Aircraft Landings - The Static Case , 2000, Transp. Sci..
[41] Min Xue,et al. Uncertainty Analysis of Integrated Departures and Arrivals: A Los Angeles Case Study , 2013 .
[42] Heinz Erzberger,et al. Analysis of delay reducing and fuel saving sequencing and spacing algorithms for arrival traffic , 1991 .
[43] Hamsa Balakrishnan,et al. Scheduling Aircraft Landings under Constrained Position Shifting , 2006 .
[44] H. M. Soroush,et al. Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem , 2007, Eur. J. Oper. Res..
[45] Jeffrey S. Smith,et al. Algorithms for single machine total tardiness scheduling with sequence dependent setups , 2006, Eur. J. Oper. Res..
[46] Min Xue,et al. Optimal Integration of Departures and Arrivals in Terminal Airspace , 2012 .
[47] Yoon C. Jung,et al. A Mixed Integer Linear Program for Airport Departure Scheduling , 2009 .
[48] Mark Hansen,et al. DYNAMIC STOCHASTIC OPTIMIZATION MODEL FOR AIR TRAFFIC FLOW MANAGEMENT WITH EN ROUTE AND AIRPORT CAPACITY CONSTRAINTS , 2005 .
[49] Min Xue,et al. Optimization of Integrated Departures and Arrivals Under Uncertainty , 2013 .
[50] Shannon Zelinski. A framework for integrating arrival, departure, and surface operations scheduling , 2014, 2014 IEEE/AIAA 33rd Digital Avionics Systems Conference (DASC).
[51] A. Shapiro,et al. The Sample Average Approximation Method for Stochastic Programs with Integer Recourse , 2002 .
[52] Mark Hansen,et al. A Dynamic Stochastic Model for the Single Airport Ground Holding Problem , 2007, Transp. Sci..
[53] P. C. Roling,et al. Optimal airport surface traffic planning using mixed-integer linear programming , 2008 .
[54] Karol Miller,et al. Real-Time Nonlinear Finite Element Computations on GPU - Application to Neurosurgical Simulation. , 2010, Computer methods in applied mechanics and engineering.
[55] Roger George Dear. The dynamic scheduling of aircraft in the near terminal area , 1976 .
[56] Heinz Erzberger,et al. Improvement of Trajectory Synthesizer for Efficient Descent Advisor , 2011 .
[57] John-Paul Clarke,et al. Identification of flow constraint and control points in departure operations at airport systems , 1998 .
[58] Zhifan Zhu,et al. Validation of Simulations of Airport Surface Traffic with the Surface Operations Simulator and Scheduler , 2013 .
[59] Amedeo R. Odoni,et al. Dynamic solution to the ground-holding problem in air traffic control , 1994 .
[60] Shawn A. Engelland,et al. Trajectory-Based Takeoff Time Predictions Applied to Tactical Departure Scheduling: Concept Description, System Design, and Initial Observations , 2011 .
[61] Alexander Martin,et al. Robust Runway Scheduling using a time-indexed model , 2014 .
[62] Banavar Sridhar,et al. A Generalized Dynamic Programming Approach for a Departure Scheduling Problem , 2009 .
[63] Monish Tandale,et al. Massively Parallel Optimal Solution to the Nationwide Traffic Flow Management Problem , 2013 .
[64] Laurel Stell. Prediction of Top of Descent Location for Idle-thrust Descents , 2011 .
[65] Nam Sung Kim,et al. The case for GPGPU spatial multitasking , 2012, IEEE International Symposium on High-Performance Comp Architecture.