Single-machine group scheduling with processing times dependent on position, starting time and allotted resource

Abstract This article considers scheduling problems on a single machine with learning effect, deteriorating jobs and resource allocation under group technology (GT) assumption. We assume that the actual processing time of a job depends on the job position, the group position, the starting time and the amount of resource allocated to them concurrently, and the actual setup times of groups depend on the group position and the amount of resource allocated to them concurrently. Two resource allocation functions are examined for minimizing the weighted sum of makespan and total resource cost. We prove that the problems have polynomial solutions under the condition that the number of jobs in each group are the same.

[1]  Yu-Bin Wu,et al.  Single machine past-sequence-dependent delivery times scheduling with general position-dependent and time-dependent learning effects , 2013 .

[2]  Feng Chu,et al.  Single-machine group scheduling with resource allocation and learning effect , 2011, Comput. Ind. Eng..

[3]  Dan Wang,et al.  Single-machine group scheduling with deteriorating jobs and allotted resource , 2014, Optim. Lett..

[4]  Yu Zhang,et al.  Single-machine ready times scheduling with group technology and proportional linear deterioration , 2014 .

[5]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[6]  Suh-Jenq Yang,et al.  Group scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machine , 2011 .

[7]  Adam Janiak,et al.  Resource Management in Machine Scheduling Problems: A Survey , 2007 .

[8]  Jian-Jun Wang,et al.  Single-machine due date assignment problem with deteriorating jobs and resource-dependent processing times , 2013 .

[9]  Dirk Biskup,et al.  A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..

[10]  Wen-Hung Kuo Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect , 2012, Ann. Oper. Res..

[11]  Suh-Jenq Yang,et al.  Parallel machines scheduling with deterioration effects and resource allocations , 2012 .

[12]  Dvir Shabtay,et al.  A survey of scheduling with controllable processing times , 2007, Discret. Appl. Math..

[13]  Xue-Ru Wang,et al.  Single-machine scheduling with convex resource dependent processing times and deteriorating jobs , 2013 .

[14]  Suh-Jenq Yang,et al.  Multiple common due dates assignment and scheduling problems with resource allocation and general position-dependent deterioration effect , 2013 .

[15]  Adam Janiak,et al.  Scheduling Problems with Learning and Ageing Effects: A Survey , 2011 .

[16]  Ji-Bo Wang,et al.  Scheduling Jobs with Processing times Dependent on Position, Starting Time, and Allotted Resource , 2012, Asia Pac. J. Oper. Res..

[17]  Suh-Jenq Yang,et al.  Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time , 2013 .

[18]  Suh-Jenq Yang,et al.  Single-machine scheduling with joint deterioration and learning effects under group technology and group availability assumptions , 2011 .

[19]  Suh-Jenq Yang,et al.  Single-machine group scheduling problems under the effects of deterioration and learning , 2010, Comput. Ind. Eng..

[20]  Ceyda Oguz,et al.  Parallel machine scheduling with additional resources: Notation, classification, models and solution methods , 2013, Eur. J. Oper. Res..

[21]  Ji-Bo Wang,et al.  Group scheduling with independent setup times, ready times, and deteriorating job processing times , 2011, The International Journal of Advanced Manufacturing Technology.

[22]  Xi Zhang,et al.  Several flow shop scheduling problems with truncated position-based learning effect , 2013, Comput. Oper. Res..

[23]  Cheng Wang,et al.  Single-machine due-window assignment problem with learning effect and deteriorating jobs , 2011 .