The bowtie method: a review
暂无分享,去创建一个
[1] Nahla Ben Amor,et al. A Bayesian approach to construct bow tie diagrams for risk evaluation , 2013 .
[2] Clifton A. Ericson,et al. Event Tree Analysis , 2005 .
[3] Valerio Cozzani,et al. Reference criteria for the identification of accident scenarios in the framework of land use planning , 2013 .
[4] Nijs Jan Duijm,et al. Safety-barrier diagrams as a safety management tool , 2009, Reliab. Eng. Syst. Saf..
[5] Faisal Khan,et al. A framework for human error analysis of offshore evacuations , 2013 .
[6] Nima Khakzad,et al. Dynamic safety risk analysis of offshore drilling , 2014 .
[7] Adam S. Markowski,et al. Fuzzy logic for process safety analysis , 2009 .
[8] Ioannis A. Papazoglou,et al. Accidents in the construction industry in the Netherlands: An analysis of accident reports using Storybuilder , 2008, Reliab. Eng. Syst. Saf..
[9] L.W.D. Cullen,et al. The public inquiry into the Piper Alpha disaster , 1993 .
[10] W. Haddon. Energy damage and the ten countermeasure strategies. , 1973, Human factors.
[11] R. Sadiq,et al. Analyzing system safety and risks under uncertainty using a bow-tie diagram: An innovative approach , 2013 .
[12] W. G. Johnson,et al. MORT: The Management Oversight and Risk Tree , 1975 .
[13] Brian Veitch,et al. Handling and updating uncertain information in bow-tie analysis , 2012 .
[14] Christian Delvosalle,et al. ARAMIS project: a comprehensive methodology for the identification of reference accident scenarios in process industries. , 2006, Journal of hazardous materials.
[15] Faisal Khan,et al. Risk-based process plant design considering inherent safety , 2014 .
[16] Jin Wang,et al. Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals. , 2011, Journal of hazardous materials.
[17] Solomon Tesfamariam,et al. Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis , 2012 .
[18] Celeste Jacinto,et al. A semi-quantitative assessment of occupational risks using bow-tie representation , 2010 .
[19] Andrew Hale,et al. Quantifying Occupational Risk: The Development of an Occupational Risk Model , 2008 .
[20] Antonis Targoutzidis. Incorporating human factors into a simplified "bow-tie" approach for workplace risk assessment. , 2010 .
[21] M. Sam Mannan,et al. Fire and explosion assessment on oil and gas floating production storage offloading (FPSO): An effective screening and comparison tool , 2009 .
[22] Owain Tucker,et al. Containment Risk Management for CO2 Storage in a Depleted Gas Field, UK North Sea , 2013 .
[23] Valerio Cozzani,et al. Dynamic approach to risk management: Application to the Hoeganaes metal dust accidents , 2014 .
[24] Andrew Hale,et al. The software tool storybuilder and the analysis of the horrible stories of occupational accidents , 2008 .
[25] Cécile Fiévez,et al. ARAMIS project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance. , 2006, Journal of hazardous materials.
[26] Olivier Salvi,et al. A global view on ARAMIS, a risk assessment methodology for industries in the framework of the SEVESO II directive. , 2006, Journal of hazardous materials.
[27] J. E. Cockshott. Probability Bow-Ties: A Transparent Risk Management Tool , 2005 .
[28] Régis Farret,et al. Addressing emerging risks using carbon capture and storage as an example , 2011 .
[29] Michael Johnson,et al. Analysis of a loss of containment incident dataset for major hazards intelligence using storybuilder , 2012 .
[30] Faisal Aqlan,et al. Integrating lean principles and fuzzy bow-tie analysis for risk assessment in chemical industry , 2014 .
[31] Faisal Khan,et al. Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network , 2013 .
[32] Ioannis A. Papazoglou,et al. Occupational risk quantification owing to falling objects , 2014 .
[33] Ioannis A. Papazoglou,et al. A logical model for quantification of occupational risk , 2007, Reliab. Eng. Syst. Saf..
[34] Faisal Khan,et al. Quantitative risk analysis of offshore drilling operations: A Bayesian approach , 2013 .
[35] Dan S. Nielsen. The cause/consequence diagram method as a basis for quantitative accident analysis , 1971 .
[36] Hans J. Pasman,et al. How can we use the information provided by process safety performance indicators? Possibilities and limitations , 2014 .
[37] Linda J. Bellamy,et al. Analysis of underlying causes of investigated loss of containment incidents in Dutch Seveso plants using the Storybuilder method , 2013 .
[38] Snorre Sklet,et al. Safety barriers: Definition, classification, and performance , 2006 .
[39] Andrew Hale,et al. The development of an audit technique to assess the quality of safety barrier management. , 2006, Journal of hazardous materials.
[40] Nahla Ben Amor,et al. A New Approach to Construct Optimal Bow Tie Diagrams for Risk Analysis , 2010, IEA/AIE.
[41] V M Trbojevic,et al. Risk based methodology for safety improvements in ports. , 2000, Journal of hazardous materials.
[42] Michalis Christou,et al. Identification of reference accident scenarios in SEVESO establishments , 2005, Reliab. Eng. Syst. Saf..
[43] Nima Khakzad,et al. Dynamic risk analysis using bow-tie approach , 2012, Reliab. Eng. Syst. Saf..
[44] F R Chevreau,et al. Organizing learning processes on risks by using the bow-tie representation. , 2006, Journal of hazardous materials.
[45] Adam S. Markowski,et al. “Bow-tie” model in layer of protection analysis , 2011 .
[46] Andrew Hale,et al. Towards risk assessment for crane activities , 2008 .
[47] J. P. Visser,et al. Developments in HSE Management in Oil and Gas Exploration and Production , 1998 .
[48] Ioannis A. Papazoglou,et al. Storybuilder - A tool for the analysis of accident reports , 2007, Reliab. Eng. Syst. Saf..
[49] Nahla Ben Amor,et al. A new multi-objectives approach to implement preventive and protective barriers in bow tie diagram , 2014 .
[50] Andrew Hale,et al. Quantified risk assessment for fall from height , 2008 .
[51] Ioannis A. Papazoglou,et al. Quantification of occupational risk owing to contact with moving parts of machines , 2013 .
[52] Gareth Hughes,et al. Rail ruminations for process safety improvement , 2009 .