Analysis and Control of Layer Deformation Induced by the Densely Arranged Large Diameter Underground Steel Tubes Jacking with NTR Method
暂无分享,去创建一个
Combined with the finite element method (FEM) and the field data of Shenyang Metro NTR engineering for pipe jacking process, the variation of surface deformation and influence factors of NTR construction are systematically analyzed. The result is shown that the curves of the lateral surface subsidence produced by pipe jacking process are accord with the normal distribution curves put forward by Peck .When the top steel pipes are jacked , the surface subsidence develops rapidly and the rate of deformation is larger. In addition , grouting behind the wall and the sequence of the pipe jacking all have a greater impact on the deformation of the layer.